My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-03_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2012-12-03_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:06 PM
Creation date
12/3/2012 12:54:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
12/3/2012
Doc Name
Response to JoEllen telefaxed dated on November 22,2012
From
OSM
To
Ms. JoEllen Turner
Type & Sequence
PR7
Email Name
DAB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determined by the Division to be confidential according to 2.07.5, <br />available for the public to inspect and copy. This shall be done by <br />filing a copy of the application submitted to the Division with the <br />recorder at the courthouse of the county where the mining is <br />proposed to occur, or another equivalent public office if it is <br />determined that that office will be more accessible to local <br />residents than the county courthouse. <br />(b) The applicant shall file the copy of the complete application less <br />confidential matters, by the first date of newspaper advertisement <br />of the application. The applicant shall file any subsequent revision <br />of the application with the public office at the same time the <br />revision is submitted to the Division. <br />(5) Any person having an interest which is or may be adversely affected by <br />a decision of the Division regarding the proposed surface coal mining <br />operation, or the officer or head of any Federal, State, or local <br />government agency or authority, shall have the right to submit written <br />objections to or comments upon the initial or revised application for a <br />permit, permit revision or permit renewal, to the Division within 30 <br />days after the last publication of the above notice. Such objections and <br />comments shall immediately be transmitted to the applicant by the <br />Division and shall be made available to the public, at the same locations <br />as the application. <br />(6) Informal Conference. <br />(a) Within 30 days after the last publication of the notice specified in <br />2.07.3(2), any person who files objections or comments pursuant <br />to 2.07.3(3)(c), 2.07.3(5), or 3.03.2(3), may request an informal <br />conference. The request shall: <br />(i) Briefly summarize the issues to be raised by the requestor at <br />the conference; and <br />(ii) State whether the requestor desires to have the conference <br />conducted in the locality of the proposed mining operations. <br />(b) Except as provided in 2.07.3(6)(c), if an informal conference is <br />requested, the Division shall hold the informal conference within <br />60 days after the last publication of the newspaper advertisement. <br />The informal conference shall be conducted according to the <br />following: <br />(i) It shall be held in the locality of the proposed surface coal <br />mining operation or release. <br />
The URL can be used to link to this page
Your browser does not support the video tag.