Laserfiche WebLink
Total acres <br />backfilled: <br />n lin e <br />Total acres <br />seeded w/ <br />approved mix: <br />, pit r <br />�c,�� <br />Total acres <br />w /topsoil <br />replaced: <br />Topsoil <br />replacement <br />depth (in.): <br />G 6 r L <br />6 `,' <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons /ac): <br />re <br />, i <br />Total acres <br />graded: <br />c7C'G� <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />Seed <br />application <br />method: <br />G" <br />L <br />C G 5T <br />Fertilizer <br />application <br />method: <br />fl /,.� <br />1 <br />Mulch <br />application <br />method: <br />) <br />gr ^ L mac c U -1- <br />Permittee Name: <br />American Shale Oil, LLC <br />Permit Number: <br />P- 2008 -046 <br />Operation Name: <br />AMSO RD &D Project -Phase 1 <br />County: <br />Rio Blanco <br />Annual Fee Due: <br />$86.00 <br />Anniversary Date: <br />October 21, 2012 <br />Permit Acreage: <br />10.70 <br />Current Bond Amt: <br />$546,893.00 <br />C hM <br />I <br />r <br />MP Annual Report <br />According to Colorado Statute, each year, on the anniversary date of the permit, an operator shall submit the Annual Fee, <br />an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring information, <br />reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br />the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the beginning of active <br />operations, and the date active operations ceased for the year. <br />Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br />compliance inspection of the site. If, while completing this report, you learn that your site is not in compliance with the <br />rules and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the affected area boundary clearly marked if you have an excavation or portal? <br />2. Is the site in final reclamation? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />3. What was the date of last exploration activity? C L( Ire r) I <br />4. What date did prospecting activity end, or what date is it expected to end? Rule 5.6.1(e). 2C 1 7 <br />5. Number of acres currently affected (exploration+ incomplete reclamation). 1 2, <br />6. Number of acres that were newly affected during the current report year. /1 C 'l E <br />7. Number of acres that were reclaimed during the current report year. <br />� ec 6 VLD a � e <br />8. Estimated new acreage to be affected in the next report year. NOV 2 9 2012 2 <br />9. Estimated acres to be reclaimed in the next report year. <br />1- rvimen et Reclamation <br />Mining & Safety <br />10. Total acres in various stages of reclamation, since permitted exploration activities began: <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? <br />If "NO ", please explain: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment on the report map. <br />NO N/A <br />