Sincenely, <br />When the removal of the temporary casing is complete, the well will be immediately <br />filled with cement as an abandonment procedure. After completely cementing the <br />well bore, tremmying the cement from bottom to top, the surface casing will be cut <br />off below the ground surface, and the drill site will be recontoured and reclaimed. <br />2. "Isolate aquifers ". The near surface aquifers, Dakota aquifer, if present (Dakota <br />and Burro Canyon Formations) and Navajo aquifer (Entrada, Navajo, and Wingate <br />Formations) will be isolated by the surface casing set into the top of the Chinle <br />Formation and cemented to surface. The Dakota aquifer may not be present if the <br />well is spudded below the Dakota/Burro Canyon stratigraphic level, depending on <br />which drill site is selected. <br />The deeper aquifers in the Cutler and Hermosa Formations will be isolated by the <br />temporary casing during the coring of the target horizons, and then isolated by the <br />complete cement plug after abandonment of the well. <br />Jon P. Thorson <br />Manager, Colorado Potash Project <br />2 <br />3. "Cement bond ". RM Potash plans to have electric logs run in the well bore before the <br />temporary casing is set in the top of the Paradox Formation. At that time the logging <br />contractor will be requested to run a cement bond log on the suface casing to verrify <br />the cement -to -steel bond isolating the Dakota and Navajo aquifers. <br />4. "Cement plugging ". RM Potash has committed to a complete cement plug in the well <br />bore for abandonment. Cement will be tremmyed from bottom to top, completely <br />filling the well bore with cement. This stipulation is included in the EA (DOI -BLM- <br />CO -5010 -2009 -0076) in section 2.2.3 under the heading "Drill Holes ". Although the <br />term " tremmying" for placement of the cement was not used in the document, that <br />procedure was intended as the cement placement method by RM Potash. <br />5. "Plugging and Abandonment ". The bore hole will be cemented by tremmying cement <br />from bottom to top as the plugging procedure stipulated in the EA (DOI- BLM -CO- <br />S010- 2009 - 0076), and elaborated above in #1 and #4 of this letter. After cementing, <br />the surface casing will be excavated and cut off 4 feet below the level of the drill site; <br />the drill site will be recontoured and reclaimed as specified in the EA, and a <br />permanent steel marker will be placed over the location of the surface casing. <br />I trust that these explanations will be sufficient clarification of the concerns expressed in your <br />letter of November 15. Besides the copies of this letter sent to your Durango location, I will <br />also send copies to the State office in Denver. If you need additional clarification, please <br />contact me at the address or phone number above. <br />