My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-27_PERMIT FILE - C1981022
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981022
>
2012-11-27_PERMIT FILE - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:52 PM
Creation date
11/29/2012 8:30:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Permit File
Doc Date
11/27/2012
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 023 <br />Date : 04/06!1006 <br />User: JRS <br />State :Colorado PermiUjob # : C-81-022 <br />County :Delta Abbreviation :none <br />Site :Sanborn Creek Mine Filename : C022-023 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description :Rip Cover Material for East Refuse Plle <br />HOURLY EQUIPMENT COST <br />Basic machine :Cal 09R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.63 NA <br />Dozer operating cost/hour : $104.98 100 <br />Ripper operating cosUhour: $12.43 100 <br />Operator cesUhour : $32.53 NA <br />Total unit cosUhour : $207.57 Total fleet cosUhour : $207.57 <br />MATERIAL QUANTITIES <br />Selected estimating method : Seismic <br />Alternate methods - <br />Seismic : 14,116 BCY Load factor : NA <br />Area : NA acres Rip depth (ft) : NA <br />Bank volume : 14,116 BCY <br />Volume : NA BCY or CCY <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : 4, 000 feeUsecond <br />Unadjusted production : 1,352.40 cu. yds./hour <br />Unadjusted production <br />per selected method: 1,352.40 cu.yds./hour <br />Area : Avg. ripping depth : NA feeUpass Site altitude : 6, 200 feet <br />Average ripping width : NA feetpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : NA feeUpass Job efficiency factor : 0.83 (1 shiR/day) <br />Average dozer speed : NA feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : NA minutes/pass <br />Production per unit area : NA acres/hour Adjusted unit production : 1,122.49 cu. yds./hour <br />Unadjusted production : NA cu yds./hour Adjusted fleet production : 1,122.49 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 12.58 hours <br />Unit cest : $0.185 per cu. yd. Total job cost : $2,610 <br />
The URL can be used to link to this page
Your browser does not support the video tag.