Laserfiche WebLink
The site for the west expansion to gob pile #2 will initially be cleared of trees and <br />heavy brush. Then, approximately 4,100 cubic yards of topsoil and <br />approximately 60,900 cubic yards of coverfill material will be salvaged. The <br />salvaged topsoil and coverfill material may not be stockpiled, but will likely be <br />used to for reclamation of gob pile #2. <br />The area for the west and north expansion of gob pile #2 will initially be cleared <br />of trees and heavy brush. Then, approximately 11,810 cubic yards of topsoil and <br />approximately 29,600 cubic yards of coverfill material will be salvaged. The <br />salvaged topsoil and coverfill material may not be stockpiled, but will likely be <br />used to for reclamation of gob pile #2. <br />TR -76 - 7 - 11/12 <br />