Laserfiche WebLink
Mark Heifner -2- 2/10/78 <br /> reclamation of these areas around the year 2015 . If eco- <br /> nomically and practically feasible, and in consultation with <br /> the Mined Land Reclamation Staff, such a plan would be <br /> implemented to obtain a limited amount of sediments for top <br /> dressing the rock covered tailing ponds. <br /> As specified on the Base Map to the reclamation plan, <br /> the Supply Canal #1 and Clinton Creek Canal are to be con- <br /> sidered affected lands. To the extent that the Base Map <br /> conflicts with the description of "Bond Excluded Disturbances" <br /> on pages 6-2 and 6-3 of the reclamation plan, the desig- <br /> nation of affected lands contained in the Base Map shall <br /> control. <br /> Sincerely <br /> 0 <br /> Ronald H. Zuck <br /> RHZ/sa <br />