Laserfiche WebLink
NORTHWEST COLORADO NOTIFICATION POLICY 5/10/2012 <br />REVISION NO. 3 <br />QUESTIONS <br />Please direct any questions regarding these notification procedures to <br />David D. Andrews, P.E., P.G. <br />Engineering Supervisor - Western Colorado <br />State of Colorado <br />Oil and Gas Conservation Commission <br />707 Wapiti Court, Suite 204 <br />Rifle, Colorado 81650 <br />Office Phone: (970) 625 -2497 Ext. 1 <br />Cell Phone: (970) 456 -5262 <br />Fax: (970) 625 -5682 <br />E -mail- David Andrews ccbstate co.us <br />Website: http- / /www.colorado.gov /coqcc <br />* Policv Revisions <br />Revision No. 1, January 21, 2010: Shaun Kellerby added as a point -of- contact to Chuck Browning and <br />Mike Longworth notification areas for Notices of Intent and Subsequent Reports. Other minor format and <br />editorial changes. <br />Revision No. 2, September 21, 2010- Added "perform mechanical integrity test," "perform bradenhead <br />test," and "commence completion operations," to Notices of Intent. Changed "spud a conductor" to "set <br />conductor pipe" to eliminate any confusion concerning the formal (surface casing) spud of a well. Shaun <br />Kellerby was replaced with Kris Neidel as primary point -of- contact for Eagle, Grand, Jackson, Moffat, <br />Routt, and Summit Counties. Changed primary point -of- contact for accident reports from David Andrews <br />to Shaun Kellerby. Other minor format and editorial changes. <br />Revision No. 3, May 10, 2012: Revised policy to require Form 42 submittal for all Notices of Intent, and <br />certain Subsequent Reports (lost circulation and high bradenhead pressure during stimulation). Added <br />requirement for notification of pit liner installation. Changed Notice of Intent for "commencement of <br />completion operations" to "commencement of hydraulic fracturing operations." Added definitions for <br />"significant" lost circulation and well control events. Defined reporting requirements for subsequent <br />reports of cement jobs and water flows. Removed requirement to copy field inspector and field inspection <br />supervisor on emailed subsequent reports of cement jobs. Defined a 24 -hour submittal deadline for <br />Subsequent Reports and Other Downhole Operations. <br />Page 3 of 3 <br />