My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-15_REVISION - M1980244 (17)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-12-15_REVISION - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:08 PM
Creation date
11/28/2012 3:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/15/2011
Doc Name
HIGH VOLUME SOLUTION COLLECTION PIPING LAYOUT
From
CC&V
To
DRMS
Type & Sequence
TR64
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N 53,000 <br />N- s2,000 <br />X ; SEDIMENT - -, I /, \ - _ <br />COLLECTION - <br />POND <br />wor— <br />�O I \ 0— <br />I _- <br />Ili <br />6,415 <br />26" DIA. PIPE <br />SECONDARY SOLUTION COLLECTION PIPE <br />75,660 <br />4" DIA. PIPE <br />6,980 <br />8" DIA. PIPE <br />4,550 <br />i b <br />I <br />ilf f r� <br />16" DIA. PIPE <br />/ <br />O <br />N 51,000 <br />i <br />PER <br />✓ <br />4�'% <br />A 952 TYPICAL t\ <br />\\ <br />N 50,000 <br />F <br />�a )00, ;� o <br />---tom <br />_- <br />-- <br />10 <br />MOP <br />=`=0 <br />,?000_ <br />RIC <br />IN 49,00A:ININ�s <br />MW <br />Oi O 71 <br />vj <br />»1 <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY BY CC&V WAS REVISED FROM <br />PHOTOGRAPHY TAKEN 9 -28 -2006. SOME AREAS OF REVISION BASED IN <br />PART ON SURVEY DATA SUPPLIED BY FORESIGHT WEST SURVEYING INC. <br />5 -29 -2007. S: \CAD \1125 - CC&V PHASE 5 <br />VLF \RECV \20070622 - PROJECT MAP\061 1 0-TOPO-REVISED2.DWG <br />300 0 300 600 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />FINISHED GRADE GROUND SURFACE CONTOUR AND EL, FEET <br />EXISTING ROADS <br />i/'— � .wol PHASE 5 VLF LIMIT <br />� aw0o CERTIFICATION BOUNDARY LIMIT <br />SOLUTION COLLECTION PIPING: <br />4" DIA. CPe HIGHWAY GRADE TERTIARY SOLUTION COLLECTION PIPE PLACED ON 90' <br />CENTERS <br />- -- - -- 8" DIA. CPe (ADS N -12 OR EQUIVALENT) SECONDARY SOLUTION COLLECTION PIPE <br />12" DIA. CPe (ADS N -12 OR EQUIVALENT) SECONDARY SOLUTION COLLECTION PIPE <br />16" DIA. CPe (ADS N -12 OR EQUIVALENT) SECONDARY SOLUTION COLLECTION PIPE <br />- 26" DIA. DR11 PERFORATED HDPE PRIMARY SOLUTION COLLECTION PIPE <br />PHASE 5 PIPING TABLE <br />APPROXIMATE TOTAL LENGTH <br />OF PIPE SEGMENT (FEET) <br />(SEE NOTE 1) <br />PIPE SIZE <br />PRIMARY SOLUTION COLLECTION PIPE <br />6,415 <br />26" DIA. PIPE <br />SECONDARY SOLUTION COLLECTION PIPE <br />75,660 <br />4" DIA. PIPE <br />6,980 <br />8" DIA. PIPE <br />4,550 <br />12" DIA. PIPE <br />3,700 <br />16" DIA. PIPE <br />NOTES: <br />1. PIPE LENGTH INCLUDES 5 PERCENT WASTAGE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.