Laserfiche WebLink
SOIL LINER FILL BORROW <br />Ploo 0 200 400 <br />DEFERENCE: <br />XISTING GROUND TOPOGRAPHY BY CC &V WAS REVISED FROM <br />° HOTOGRAPHY TAKEN 9 -28 -2006. SOME AREAS OF REVISION BASED IN <br />?ART ON SURVEY DATA SUPPLIED BY FORESIGHT WEST SURVEYING INC. <br />-29 -2007. S: \CAD \1125 - CC &V PHASE 5 <br />OVERALL <br />/ <br />/ <br />PROJECT SITE MAP <br />2000 0 2000 4000 FEET <br />/ <br />i <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR EL, FEET <br />.�'-� ----� HIGHWAY 67 <br />PHASE 5 VLF BOUNDARY <br />EXISTING ROADS <br />— — EXISTING DRAINAGES <br />/ <br />E —E-� EXISTING POWER CABLE <br />w- -w --- EXISTING WATER LINE <br />/ EISWTP -27 SMITH WILLIAMS TEST PIT JUNE 2007 <br />CB -13 GOLDER ASSOCIATES TEST PIT 2004 <br />/ SOIL LINER FILL BORROW AREA <br />CLIENT <br />