Laserfiche WebLink
Figure 1 <br />Figure 2 <br />Figure 3 <br />Figure 4 <br />Figure 5 <br />Drawing A000 <br />Drawing A100 <br />Drawing A110 <br />Drawing Al20 <br />Drawing A130 <br />Drawing A210 <br />Drawing A220 <br />Drawing A222 <br />Drawing A223 <br />Drawing A224 <br />Drawing A225 <br />Drawing A226 <br />Drawing A250 <br />Drawing A280 <br />Drawing A285 <br />Drawing A290 <br />Drawing A400 <br />Drawing A410 <br />Drawing A520 <br />Drawing A530 <br />LIST OF FIGURES <br />Cresson Project VLF Site Plan <br />Certification Boundary <br />Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />PSSA Stage Storage Curve <br />LIST OF IFC DRAWINGS <br />VLF Title Sheet <br />Existing Site Conditions <br />Site Geology Map <br />Historic Underground Workings <br />Soil Liner Fill Borrow Area <br />Valley Leach Facility Cross Sections <br />Phase 5 Grading Plan <br />Phase 5 Grading Alignment Plan View <br />Phase 5 Grading Horizontal Alignment Data Sheet 1 of 2 <br />Phase 5 Grading Horizontal Alignment Data Sheet 2 of 2 <br />Phase 5 Grading Vertical Alignment Data Sheet 1 of 2 <br />Phase 5 Grading Vertical Alignment Data Sheet 2 of 2 <br />Valley Leach Facility Sections and Details <br />Leak Detection and Typical Erosion Control Details <br />Leak Detection Manholes <br />Underground Remediation Typical Details <br />High Volume Solution Collection Piping Layout <br />High Volume Solution Collection System Details <br />Surface Water Diversion Sections and Details <br />Sediment Collection Pond Riser and Culvert Details <br />LIST OF APPENDICES <br />AMEC Earth & Environmental, Inc. <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec.com iv <br />ame0 <br />Appendix A Record (As- Built) Drawings <br />Record Drawing No. 1 of 5 General Composite Overview <br />Record Drawing No. 2 of 5 Leak Detection Trench As -Built <br />Record Drawing No. 3 of 5 Top of Soil Liner Fill As -Built <br />Record Drawing No. 4 of 5 2011 Phase 5 VLF 3 Portion Geomembrane As Built <br />Record Drawing No. 5 of 5 High Volume Solution Collection System Piping <br />Appendix B Photographic Documentation <br />Appendix B.1 Photograph Log <br />Appendix B.2 Documentary Photographs <br />Appendix C Staff Schedule for AMEC Personnel <br />