My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
11/28/2012 3:04:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 1 of 3 2011 phase 5 valley leach facility ore storage 1 OF 1
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required, and verified that all repairs were completed to project specifications. After final <br />grading, AMEC monitored removal of PVC grade markers. <br />4.2.6 Temperature Monitoring <br />AMEC monitored ambient air temperatures using a Davis Vantage Pro 2 data - logging <br />weather system. Temperatures were measured every hour. The lowest and highest daily <br />temperatures are summarized in Table 2. <br />During placement of fill materials, when the ambient air temperature was less than 32 °F for <br />longer than 1 hour in the previous 24 hours, AMEC was required to monitor the fill <br />temperatures at depths of 3 inches and 6 inches, at a frequency of 6 tests per acre, and <br />calculate the average fill temperature from the lower temperature of the 3 -inch and 6 -inch <br />tests. No frozen materials were placed during the construction of the 2011 Phase 5 VLF <br />OSA 3rd Portion. Fill temperature monitoring is summarized in Table 3. <br />4.2.7 Underground Workings <br />ame9 <br />AMEC monitored the remediation of Underground Working No. 3014, including verification <br />that excavations were performed to minimum required dimensions, and that geogrid, SSF <br />and SF were installed as specified. <br />For remediation of Underground Working No. 3014, AMEC observed Ames backfilling the <br />working with structural fill and placing two layers of UX 1800 HS geogrid. The bottom layer <br />of geogrid was installed with six inches of SSF cover and compacted with a Caterpillar <br />CS563 SDVR, and then the second layer of geogrid was installed transverse to the first. <br />Twelve inches of SF was then placed and compacted. As -built drawings of the the <br />remediation are presented in Appendix N.1. <br />AMEC Earth & Environmental, Inc <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.