Laserfiche WebLink
14am6rf Page B -40 of 62 <br />CONSU G GGEOTECH ICAL ENGINEERS AND MATERIAL TESTING <br />Client: Barr Engineering <br />Project: RPE Expansion, Barr Project <br />Number 06261003 <br />Project Number: M09060MT <br />Location: Delivered <br />Sample Description: <br />Date Received: July 21, 2009 <br />Date Tested: July 23- August 18, 2009 <br />Sample Number: 1539 <br />Sample Source: Refuse Pile Expansion <br />ATTERBERG LEMTS TEST RESULTS <br />Boring Number <br />Liquid Limit <br />Plastic Limit <br />Plasticity Index <br />B -1 @ 10.0 —11.5 ft. <br />30 <br />14 <br />16 <br />B -2 @ 9.0 —10.5 ft. <br />49 <br />33 <br />16 <br />B -3 @ 10.0 —11.5 ft. <br />47 <br />22 <br />25 <br />B -5 @ 10.0 —11.5 ft. <br />42 <br />21 <br />21 <br />B -6 @ 13.5 —15.0 ft. <br />40 <br />19 <br />21 <br />B -6 @ 16.0 —17.5 ft. <br />43 <br />23 <br />20 <br />B -6 @ 19.0 — 20.5 ft. <br />39 <br />22 <br />17 <br />B -6 @ 24.0 — 25.5 ft. <br />40 <br />19 <br />21 <br />B -7 @ 5.0 — 6.5 ft. <br />40 <br />18 <br />22 <br />B -8 @ 5.0 — 6.5 ft. <br />39 <br />21 <br />18 <br />B -8 @ 15.0 —16.5 ft. <br />39 <br />17 <br />22 <br />B -9 @ 10.0 —11.5 ft. <br />35 <br />20 <br />15 <br />B -9 @ 15.0 —16.5 ft. <br />34 <br />20 <br />14 <br />B -9 @ 25.0 — 26.5 ft. <br />45 <br />22 <br />23 <br />