Laserfiche WebLink
Void Ratio and % Settlement vs. Log of PressLM B -22 of 62 <br />0.10 1.00 Pressure (tsf) 10.00 100.00 <br />0.47 <br />-2.5% <br />0.46 <br />-1.5% <br />045 <br />-05% <br />0.44 <br />0.43 <br />0.5% <br />0.42 <br />0.41 <br />0.40 <br />2.5% <br />0.39 <br />0.38 <br />3.5% <br />_ <br />v <br />o <br />E <br />0.37 <br />4.5-2 <br />a <br />0 <br />U) <br />0.36 <br />5.5% <br />0.35 <br />0.34 <br />6.5% <br />0.33 <br />7.5% <br />0.32 <br />8.5% <br />0.31 <br />_ <br />0.30 <br />- - <br />9.5% <br />0.29 <br />10.5% <br />0.28 <br />0.27 <br />Project: West Elk Mine RPE Expansion - #06261003 <br />Date- 8/14/09 <br />Sample #: 3 <br />Boring #: East End <br />Depth ft: <br />Job #: 7110 <br />Soil Type: Coal <br />Initial W/C ( %): 13.5 <br />Dry Density (pcf): 72.3 <br />LL: 31.5 PL: 22.2 PI: 9.3 <br />Gs: 1.66 <br />Organic Content ( %): 36.7 <br />Initial Height (in.): 0.900 <br />Diameter (in.): 2.506 <br />e°= 0.434 <br />Preconsolidation Pressure (Pc): 2.8 tsf <br />Compression Index (Cc): 0.15 <br />Recompression Index (Cr): __ 0.02 <br />Remarks: Specimen compacted to approximately 90% of maximum standard proctor density. <br />OIL <br />9301 Bryant Ave. South, Suite 107 NGINEERING Bloomington, Minnesota 55420 -3436 <br />TESTING, INC. <br />