Laserfiche WebLink
Barr Engineering Company <br />4700 West 77th Street <br />BARR Minneapolis, MN 55435 -4803 LOG OF BORING B -6 <br />Sheet 3 of 3 <br />Project: Proposed RPE Expansion <br />Location: West Elk Mine, Somerset, <br />Client: Mountain Coal Company <br />CO <br />Barr Project Number: 06/261003 <br />STANDARD PENETRATION <br />NATURAL DRY <br />y <br />TEST DATA <br />DENSITY <br />w <br />a� <br />S' <br />as <br />N in blows /ft m <br />(pcf) it <br />MATERIAL DESCRIPTION <br />0 a <br />> 0 <br />10 20 30 ao <br />105 Its 125 <br />o <br />(ASTM D2488) <br />n <br />cc <br />1 <br />z <br />F: it <br />m <br />STRENGTH, ksf <br />Water Content, % <br />w <br />ern <br />/SHEAR <br />` P x UC o TV X <br />WP WN WL <br />VS o VSR O <br />1 2 3 4 <br />20 40 60 <br />60 <br />SANDSTONE Light grey /grey fine to medium grained sandstone <br />•• <br />with minor tan rusting and brown clay seams no more than 2" <br />thick. <br />:: <br />90% <br />6505 <br />65 <br />..... <br />89% <br />A NEF----------------- - - - - -- <br />SANDSTONE Tan grey sandstone with coal seams. 65.7 <br />• . <br />----------------------- - - - --- <br />..... <br />51% <br />6500 <br />SANDSTONE Rusted sandstone. 67.4 <br />---------------------------- -..... <br />SANDSTONE Light grey fine grained sandstone interbedded 69.0 <br />70 <br />with shale. <br />---------------------------- -..... <br />SANDSTONE Tan grey fine grained sandstone. 70.7 <br />72% <br />6495 <br />---------------------------—..... <br />SANDSTONE Brown -grey fine to medium grained sandstone. 7T <br />100% <br />74.5 <br />75 <br />80 <br />85 <br />90 <br />Completion Depth: 74.5 <br />Remarks: <br />Date Boring Started: 6/20/09 <br />Date Boring Completed: 6/22/09 <br />SAMPLE TYPES <br />WATER LEVELS <br />Logged By BSE <br />Auger Cutting ,Shelby Tube <br />While Drilling. <br />Drilling Contractor: Haztech <br />Drilling Method: HSA/CORE <br />Northing: 402144.6 <br />® Split Spoon n Rock Core <br />End of Drilling: <br />Eastm : 1450500.2 <br />hrs After Drilling: <br />The stratification lines represent approbmate boundaries. The transition may be gradual. <br />