Laserfiche WebLink
GCC Energy, LLC <br />Permit No. 09LP0202F <br />Final Approval <br />Page 7 <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />AIRS ID <br />DESCRIPTION <br />REMARKS <br />MAKE, MODEL, S /N, DESIGN RATING, CAPACITY <br />SPECIFIC PROVISIONS <br />DIMENSIONS CONSUMPTION THROUGHPUT <br />003 <br />Two (2) Silos and loadout: King 11 <br />PM: 0.43 tons per year <br />PM10: 0.20 tons per year <br />Coal processed. 760,000 tons per year. <br />(King I and King 11 combined.) <br />Emission factor PM: 0. 00 11 Ibs /ton <br />Emission factor PM10: 0.0005 Ibs/ton <br />004 <br />Mine ventilation: King 11 only <br />PM: 11.62 tons per year <br />PM10: 5.50 tons per year <br />Operation based on annual use- 8760 Hours/year <br />Emission factor PM: 2.65 Ibs /hour <br />Emission factor PM10: 1.26 Ibs /hour <br />005 <br />Conveyor transfers: King 11 <br />Subject to NSPS, Y <br />PM: 1.77 tons per year <br />Enclosure. <br />PM10: 0.84 tons per year <br />Coal processed: 800,000 tons per year <br />(King I and King 11 combined.) <br />Emission factor PM: 0.0044 Ibs /ton <br />Emission factor PM10: 0.0021 Ibs /ton <br />067/1103 ver. 2/00 <br />