Laserfiche WebLink
Month <br />Percent of <br />Annual <br />Production <br />(A) <br />Monthly <br />Production <br />[tons] <br />(B) <br />Water Retained <br />in Product <br />[ac -ft] <br />(C) <br />Water Used <br />for Dust Control <br />[ac -ft] <br />(D) <br />Operation <br />CU <br />[ac -ft] <br />(E) <br />November <br />7% <br />3,500 <br />0.05 <br />0.00 <br />0.05 <br />December <br />6% <br />3,000 <br />0.04 <br />0.00 <br />0.04 <br />January <br />9% <br />4,500 <br />0.07 <br />0.00 <br />0.07 <br />February <br />5% <br />2,500 <br />0.04 <br />0.00 <br />0.04 <br />March <br />6% <br />3,000 <br />0.04 <br />0.57 <br />0.61 <br />April <br />10% <br />5,000 <br />0.07 <br />0.55 <br />0.63 <br />May <br />12% <br />6,000 <br />0.09 <br />0.57 <br />0.66 <br />June <br />8% <br />4,000 <br />0.06 <br />0.55 <br />0.61 <br />July <br />10% <br />5,000 <br />0.07 <br />0.57 <br />0.64 <br />August <br />14% <br />7,000 <br />0.10 <br />0.57 <br />0.67 <br />September <br />6% <br />3,000 <br />0.04 <br />0.55 <br />0.60 <br />October <br />7% <br />3,500 <br />0.05 <br />0.57 <br />0.62 <br />Total <br />100% <br />50,000 <br />0.74 <br />4.51 <br />5.25 <br />Table No. 2 <br />Bucklen Equipment Company, Inc. <br />Bucklen Pit (M- 1982 -131) <br />Operational Consumptive Use (aka Operation CU) <br />From Mining <br />. Applegate <br />Group, lnc. <br />Date Revised: 9/21/2012 <br />AG Job #: 08 -127 <br />Total Annual Production = <br />Moisture Content of Product = <br />Water Used for Dust Control = <br />50,000 <br />2% <br />6,000 <br />tons (estimated by Operator) <br />by weight <br />gallons per day during March through October <br />Notes: <br />(A) Estimated monthly production percentages. Provided by Bucklen Equipment Company <br />(8) Monthly Production = (Total Annual Production) * (A) <br />(C) Water Retained in Product = [(Moisture Content of Product) * (B) * 2000] / (62.4 * 43560) <br />(D) Water Used for Dust Control is estimated to be 6000 gallons per clay during March through October <br />(E) Operation CU = (C) + (ID) <br />\ \hercules \Projects \08127 Bucklen Pit Augmentation \Disciplines (Technical) \Water Rights \SWSP \WY <br />2013 \Bucklen Pit 2013.xlsm <br />