Laserfiche WebLink
WY 2013 <br />Month <br />Evaporative <br />Depletions <br />[ac -ft] <br />(A) <br />Operational <br />Depletions <br />[ac -ft] <br />(B) <br />Total Mining <br />Depletions <br />[ac -ft] <br />(C) <br />Lagged <br />Depletions <br />[ac -ft] <br />(D) <br />November <br />3.56 <br />3.56 <br />7.13 <br />5.51 <br />December <br />0.00 <br />0.04 <br />0.04 <br />2.35 <br />January <br />0.00 <br />0.06 <br />0.06 <br />1.41 <br />February <br />3.74 <br />0.04 <br />3.78 <br />3.47 <br />March <br />4.90 <br />0.83 <br />5.73 <br />5.15 <br />April <br />7.95 <br />1.71 <br />9.66 <br />8.07 <br />May <br />10.47 <br />2.54 <br />13.01 <br />11.05 <br />June <br />14.76 <br />3.24 <br />18.00 <br />15.17 <br />July <br />16.24 <br />3.26 <br />19.50 <br />17.37 <br />August <br />14.98 <br />2.49 <br />17.46 <br />16.77 <br />September <br />10.58 <br />1.36 <br />11.94 <br />13.17 <br />October <br />6.90 <br />0.83 <br />7.73 <br />9.59 <br />Total <br />94.08 <br />19.95 <br />114.04 <br />109.08 <br />Table No. 3 <br />Star Ready Mix <br />Feit Pit (M- 1977 -522) <br />Total Depletions <br />Applegate <br />Group, <br />Date Revised: 10/30/2012 <br />AG Job #: 04 -157 <br />Notes: <br />(A) Evaporative Depletions from Table No. 1 <br />(B) Operational Depletions from Table No. 2 <br />(C) Total Depletions = (A) + (B) <br />(D) Lagged Depletions from AWAS with folllowing parameters. Includes lagged depletions from previous years' consumptive uses <br />Transmissivity (T) = 120,000 gpd /ft <br />Assumed Specific Yield (S) = 0.2 <br />Distance from pit to river (X) = 558 ft <br />Distance from river to no -flow boundary (W) = 4,300 ft <br />N: \04157 Feit Pit SSP \Disciplines (Technical) \Water Rights \2013 SWSP Renewal \Feit Pit 2013 SWSPv2.xlsx <br />