My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-20_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/21/2012 7:06:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
Email Regarding Cost Estimate Review (Part 1 of 2)
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
RN3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Pull back and Haul Portal Bench Fill Material to Cut <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 5/15/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: Cat 365C L 13' -7" Stick <br />Support Equipment -Load Area <br />-Dump Area <br />Road Maintenance —Motor Grader <br />-Water Truck <br />NA <br />NA <br />NA <br />NA <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -001 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $659.54 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,900 Pounds/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />122,520 Pounds <br />42.25 LCY <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$62.45 <br />$79.34 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$117.76 <br />$136.53 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$202.50 <br />$254.54 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $659.54 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $659.54 <br />MATERIAL QUANTITIES <br />Initial volume: 260,953 CCY Swell factor: 1.165 <br />Loose volume: 304,010 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,900 Pounds/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />122,520 Pounds <br />42.25 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.