Laserfiche WebLink
Page 58 of 291 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Mat'l from Bowie No. 1 Stkpl to Hubbard Crk Vent Shaft <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 026 State: Colorado <br />Date: 5/17/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 950H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -026 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort F,auinment Maintenance F,auinment <br />Total work team cost/hour: $957.41 <br />MATERIAL QUANTITIES <br />Initial volume: 3,000 CCY Swell factor: 1.125 <br />Loose volume: 3,375 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />Truck Bed (volume) Basis: <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.32 <br />$25.73 <br />$72.40 <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$62.56 <br />$42.60 <br />$140.68 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.49 <br />$38.49 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$74.88 <br />$106.81 <br />$251.56 <br />NA <br />NA <br />NA <br />Number of Units: <br />8 <br />1 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $705.85 <br />Support: $251.56 <br />Maint: $0.00 <br />Total work team cost/hour: $957.41 <br />MATERIAL QUANTITIES <br />Initial volume: 3,000 CCY Swell factor: 1.125 <br />Loose volume: 3,375 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />Truck Bed (volume) Basis: <br />CIRCES Cost Estimating Software <br />