Laserfiche WebLink
Task description: Bachfill and <br />Site: Bowie No. 2 Mine <br />BULLDOZER WORK <br />B -Seam Portal Bench <br />Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 015 State <br />Date: 5/10/2012 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat D10T - lOSU <br />574 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -015 <br />Total unit Cost/Hour: $340.43 <br />Total Fleet Cost/Hour: $1,361.72 <br />MATERIAL OUANTITIES <br />Initial Volume: 32,000 <br />Swell factor: 1.165 <br />Loose volume: 37,280 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 20% <br />Average site altitude: 6,750 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$8.34 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $340.43 <br />Total Fleet Cost/Hour: $1,361.72 <br />MATERIAL OUANTITIES <br />Initial Volume: 32,000 <br />Swell factor: 1.165 <br />Loose volume: 37,280 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 20% <br />Average site altitude: 6,750 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />