Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Haul Fill fr Adj. Mat'l Storage Area to B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado <br />Date: 5/15/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: CAT 988H <br />Support Equipment -Load Area <br />-Dump Area <br />Road Maintenance —Motor Grader <br />-Water Truck <br />NA <br />NA <br />NA <br />NA <br />ipti <br />Abbreviation: None <br />Filename: C083 -014 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $644.44 <br />MATERIAL QUANTITIES <br />Initial volume: 53,000 CCY Swell factor: 1.165 <br />Loose volume: 61,745 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,900 Pounds/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />122,520 Pounds <br />42.25 LCY <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$62.45 <br />$84.80 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$117.76 <br />$115.97 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$202.50 <br />$239.44 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $644.44 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $644.44 <br />MATERIAL QUANTITIES <br />Initial volume: 53,000 CCY Swell factor: 1.165 <br />Loose volume: 61,745 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,900 Pounds/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />122,520 Pounds <br />42.25 LCY <br />