My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-20_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/21/2012 7:06:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
Email Regarding Cost Estimate Review (Part 1 of 2)
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
RN3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br />Task description: Pull up Material for Utility Corridor <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 5/15/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13' -7" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -003 <br />Horsepower: <br />404 <br />Weight (MT): <br />70.51 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Capacity <br />Rated Capacity: 3.61 <br />Utilization % <br />Bucket Fill Factor: 0.850 <br />Ownership Cost/Hour: $79.34 <br />NA <br />LCY <br />Operating Cost/Hour: $136.53 <br />100 <br />Operator Cost/Hour: $38.67 <br />NA <br />Total Unit Cost/Hour: $254.54 <br />Total Fleet Cost/Hour: $509.09 <br />MATERIAL QUANTITIES <br />Initial volume: 11,490 CCY Swell factor: <br />1.165 <br />Loose volume: 13,386 LCY <br />Source of estimated volume: Page 3.02 -2 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: <br />SEVERE <br />Secondary Job Condition within Basic Description: <br />SEVERE <br />Cycle Time Value: <br />0.570 minutes <br />Load Bucket Capacity <br />Rated Capacity: 3.61 <br />LCY (heaped) <br />Bucket Fill Factor: 0.850 <br />Hard, tough cl <br />Adjusted Capacity: 3.07 <br />LCY <br />Job Condition Correction Factors <br />Source <br />Altitude Adj : 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 323.00 <br />Adjusted Hourly Unit Production: 268.09 <br />Adjusted Hourly Fleet Production: 536.18 <br />JOB TIME AND COST <br />Bucket Size Class: Small <br />-90%)0.850 <br />Site Altitude: 6900 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.