My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-20_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2012-11-20_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:44 PM
Creation date
11/20/2012 1:26:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
11/20/2012
Doc Name
CRDA Drainage and HaulRoad Mods TA Response (Emailed)
From
Jerry Nettleton
To
DRMS
Type & Sequence
TR80
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />i r r1 <br />1) Proposed page(s) 2.05 -71, 71. 1, and 72 do not correspond to the approved text on pages 2.05 -70 <br />through 2.05 -73. Please revise the proposed text to correspond to the approved text <br />Response: The revised text has been reviewed and edited to assure continuity with the approved <br />permit text. Copies of the revised text pages accompany these responses for replacement in the PAP. <br />2) Proposed text on page 2.05 -71 identifies the "Sage Creek Portal" as the origin of the coal to be <br />transported to the Foidel Creek Mine. .The Division does not recognize the "Sage Creek Portal " <br />as an active mining operation. If the origin of the coal to be processed at the Foidel Creek Mine <br />is the Peabody Sage Creek Mine, please revise the proposed text to reflect the Peabody Sage <br />Creek Mine rather than the Sage Creek Portal. <br />Response: The revised text has been reviewed and edited for consistency with the naming convention <br />for the permitted Sage Creek operations. Copies of the revised text pages accompany these responses <br />for replacement in the PAP. <br />3. Based on the new drainage and sediment control plan for the RDA expansion identified on <br />proposed pages 2.05 -97.4 and 97.5, culverts RDA -7 -2, RDA -5 -1, and RDA -1 b -I will be removed. <br />Exhibits 26C and 8EE identify approved designs associated with the RDA expansion. Please <br />provide revisions to Exhibits 26C and 8EE to identify the omission of culverts or provide <br />justification as to why the RDA Expansion drainage and sediment control and road designs will <br />not need to be revised. <br />Response: Exhibit 26C provides information on the geotechnical stability analysis for the proposed <br />Refuse Pile Expansion and under -drain design. As such, the proposed elimination of the three culverts <br />does not impact, or require changes to this Exhibit. Exhibit 8EE has been reviewed, and appropriate <br />changes or deletions are identified by the revision pages which accompany these responses (note that <br />Culvert RDA -5 -1 was part of the previous TR95 -21 design). <br />
The URL can be used to link to this page
Your browser does not support the video tag.