My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-19_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-19_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:41 PM
Creation date
11/20/2012 8:15:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/19/2012
Doc Name
Cost Estimate
Type & Sequence
MR133
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Cost <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Minor Revision <br />133 <br />Task #: OOB State: Colorado <br />Date: 11/19/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -00b <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />285 <br />286 <br />287 <br />288 <br />289 <br />290 <br />299 <br />300 <br />301 <br />302 <br />Regrade GVB -B13F Drill Pad <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6.50 <br />$1,635.26 <br />$915.88 <br />$654.06 <br />$268.22 <br />$1,079.28 <br />$340.21 <br />$6,255.59 <br />$13,641.26 <br />$457.52 <br />$1,020.25 <br />Regrade Light -Use Road to GVB -B 13F <br />DOZER <br />3.64 <br />Replace Topsoil from Stockpile to GVB -B13F pad <br />DOZER <br />2.60 <br />Replace Topsoil from Stockpile to GVB -B 13F <br />Light -Use Road <br />DOZER <br />1.07 <br />Reseed GVB -B13F Drill Pad <br />REVEGE <br />11.02 <br />Reseed Light -Use Road to GVB -B 13F <br />REVEGE <br />0.20 <br />Plug and Seal GVB -B13F <br />BOREHOLE <br />48.00 <br />Plug and Seal 4 Utility Holes at Fan Bench <br />BOREHOLE <br />48.00 <br />Reseed Add'1 Disturbance from Utility Boreholes <br />at Fan Bench <br />REVEGE <br />0.20 <br />Regrade Fan Bench - Utility Borehole Mudpit <br />Add'1 Dist. <br />DOZER <br />4.06 <br />SUBTOTALS: <br />125.29 <br />$26,267.53 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and /or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />20.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />$530.60 <br />$275.81 <br />$1,186.00 <br />$2,626.75 <br />$4,619.16 <br />$30,886.69 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = $1,235.47 <br />Reclamation management and /or administration: <br />3.13% <br />$966.75 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $6,821.38 <br />TOTAL BOND AMOUNT (direct + indirect) = $33,088.91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.