Laserfiche WebLink
Climax Mine — CAVR Asbestos Disposal Shaft; Closure Plan <br />November 15, 2012 <br />and the fourth held for a test at 56 days if required by the project engineer. <br />Following completion of construction, an as -built report will be prepared and certified by a <br />licensed professional engineer and submitted to the DRMS. <br />A brass plate will be embedded in the concrete identifying the shaft as an asbestos disposal <br />site. The shaft location will also be surveyed, and if necessary, a secondary monument will be <br />placed at the surface of the final grade of any fill that may be placed over the capped shaft. <br />TETRA TECH 3 <br />