Laserfiche WebLink
November 14, 2012 C-1980-005/Seneca II Mine JDM <br /> <br /> <br /> <br />OTHER (SPECIFY): <br />This was a complete coal inspection of the Seneca II mine conducted by Jason Musick of CDRMS. Elliott Russell <br />of CDRMS and Jen Hunt of Peabody Energy accompanied the inspection. The mine site was frozen and snow <br />covered during the inspection. No mining or reclamation activities were being conducted during the inspection. <br /> <br />ROADS Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />Road C, the South Road and South Road B were frozen and stable with no problems noted at the time of the <br />inspection. The South Road displayed evidence of recent grading operations. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The entire mine site has achieved Phase II bond release. The reclamation on the ground reflects Phase II status <br />and was stable with no problems noted at the time of the inspection. <br /> <br /> <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br />46 <br />Page of <br /> <br /> <br />