Laserfiche WebLink
6.4.12 Exhibit L <br />Reclamation Costs <br />Reclamation cost estimate was calculated on a per acre basis and applied to <br />maximum active mining area of 70 acres. As stated in the Reclamation Plan, <br />reclamation will occur concurrently with mining not only to minimize affected area at <br />any one time but also to reduce the need for overburden and topsoil stockpiles. <br />Direct Tasks <br />Placing topsoil and fines <br />Bull dozer <br />Loader <br />Seeding <br />Broadcasting <br />Seed mix <br />Mulch <br />Tracking seed and mulch <br />Dozer <br />Affected Area Reclaimed <br />Mobilization fee <br />Indirect Tasks <br />Liability insurance <br />Performance bond <br />Profit <br />Job Superintendent <br />Unit Quantity Cost Total Cost <br />hours <br />hours <br />Miscellaneous indirect <br />0.33 <br />0.33 <br />hours 0.33 <br />acre 1 <br />acre 1 <br />hours 0.33 <br />acre 70 <br />hours 1 <br />$ 145.00 <br />$ 145.00 <br />Subtotal <br />$ 300.00 <br />$ 350.00 <br />$ 187.50 <br />Subtotal <br />$ 154.00 <br />Subtotal <br />$ 100.00 <br />Direct <br />Expenses <br />Total <br />0.0155 <br />0.015 <br />0.1 <br />20 $ 88.00 <br />Subtotal <br />0.0925 <br />Total Bond <br />$ <br />$ <br />$ <br />47.85 <br />47.85 <br />95.70 <br />$ 99.00 <br />$ 350.00 <br />$ 187.50 <br />$ 636.50 <br />$ 50.82 <br />$ 1,515.22 <br />$ 106,065.40 <br />$ 100.00 <br />$ 106,165.40 <br />$ 1,645.56 <br />$ 1,592.48 <br />$ 10,616.54 <br />$ 1,760.00 <br />$ 15,614.58 <br />$ 11,264.65 <br />$ 133,044.63 <br />Revised October 22, 2012 13 <br />