Laserfiche WebLink
Aft <br />T-WI Ime <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />AUG 26 <br />AUG 27 <br />AUG 28 <br />AUG 29 <br />AUG 30 <br />AUG 31 <br />SEP 1 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />- <br />- <br />Bill Erickson <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ben Melly <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />- <br />Alyssa Wagner <br />- <br />GT <br />GT <br />GT <br />GT <br />- <br />- <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />I - <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 09.01.2012 <br />