My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-15_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2012-11-15_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:36 PM
Creation date
11/16/2012 8:40:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
11/15/2012
Doc Name
Letter Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR76
Email Name
SLB
SB1
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Susan Burgmaier -2- November 9, 2012 <br />Proposed Revisions: <br />The configuration of Gob Pile #2 and #4 will be changed and combined into one large <br />pile. The surface water management has been substantially revised, nearly all of the <br />flow from the revised pile configuration will be routed to Pond F. Specific changes <br />included with this revision are; <br />1. Volume II - Maps 15 -3, 18, 20, 21 -3 were revised to reflect the revised Gob Pile #2 <br />and #4 configuration and the revised location of the West Diversion Ditches #1, and #2. <br />Volume III - The Pond D Probable Hydrologic Consequences section has been <br />revised, including storage capacity required for Pond D, and ditches routed to Pond D. <br />Specific changes are shown in the revised page list shown below. <br />2. Volume IX - An entire new text section is included as well as a new Appendix A, B, <br />and a new stability analysis. Pond F Probable Hydrologic Consequences section has <br />been revised including the storage capacity required for Pond F, and the ditches routed <br />to Pond F. Figures 1, 2, and 3 were revised to reflect the revised Gob Pile #2 and #4 <br />configuration and the revised location of the West Diversion Ditches #1, and #2- <br />The location of the West Diversion Ditches was approved with Minor Revision #132. <br />The design provided with MR -132 has been replaced with this technical revision <br />application. <br />Revised permit documents: <br />Volume 11 Maps 15-3,18, 20,21-3,22-C <br />Volume III Pages Exh. 8 -17 to 8 -19i, 8 -29i, 31, 74ix, 74xi, 207, 208, 2081, and Exh. <br />8 -246 to 256. <br />Volume IX Figures 1, 2, 3, Text pages 1 -18, Appendix A, Appendix B, Stability <br />Analysis. <br />Please feel free to call me if you have any questions. <br />Sincerely, 4 <br />4&-k� Tamme Bishop, P.E. <br />Project Engineer <br />Cc: BLM, USFS <br />Paonia Public Library <br />Bill Bear <br />
The URL can be used to link to this page
Your browser does not support the video tag.