Laserfiche WebLink
Susan Burgmaier -2- November 9, 2012 <br />Proposed Revisions: <br />The configuration of Gob Pile #2 and #4 will be changed and combined into one large <br />pile. The surface water management has been substantially revised, nearly all of the <br />flow from the revised pile configuration will be routed to Pond F. Specific changes <br />included with this revision are; <br />1. Volume II - Maps 15 -3, 18, 20, 21 -3 were revised to reflect the revised Gob Pile #2 <br />and #4 configuration and the revised location of the West Diversion Ditches #1, and #2. <br />Volume III - The Pond D Probable Hydrologic Consequences section has been <br />revised, including storage capacity required for Pond D, and ditches routed to Pond D. <br />Specific changes are shown in the revised page list shown below. <br />2. Volume IX - An entire new text section is included as well as a new Appendix A, B, <br />and a new stability analysis. Pond F Probable Hydrologic Consequences section has <br />been revised including the storage capacity required for Pond F, and the ditches routed <br />to Pond F. Figures 1, 2, and 3 were revised to reflect the revised Gob Pile #2 and #4 <br />configuration and the revised location of the West Diversion Ditches #1, and #2- <br />The location of the West Diversion Ditches was approved with Minor Revision #132. <br />The design provided with MR -132 has been replaced with this technical revision <br />application. <br />Revised permit documents: <br />Volume 11 Maps 15-3,18, 20,21-3,22-C <br />Volume III Pages Exh. 8 -17 to 8 -19i, 8 -29i, 31, 74ix, 74xi, 207, 208, 2081, and Exh. <br />8 -246 to 256. <br />Volume IX Figures 1, 2, 3, Text pages 1 -18, Appendix A, Appendix B, Stability <br />Analysis. <br />Please feel free to call me if you have any questions. <br />Sincerely, 4 <br />4&-k� Tamme Bishop, P.E. <br />Project Engineer <br />Cc: BLM, USFS <br />Paonia Public Library <br />Bill Bear <br />