My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-15_REVISION - C1982057 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2012-11-15_REVISION - C1982057 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:36 PM
Creation date
11/15/2012 10:31:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
11/15/2012
Doc Name
Letter & Application
From
Seneca Coal Company
To
DRMS
Type & Sequence
SL4
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seneca 11- {t" --1 Bond Release <br />Page 2 <br />T5N, R88 \V" <br />Section 9: Portions of SP/NEVI, NE'/SE'/a, and W1/2NE1/4 <br />Section 10: S'/2S' /2NW' /4, SW1/4, SE' /4, Portions of S1/2NEV4 <br />Section 11: Portions of S'/ S'/ SW' /4 <br />Section 14: Portions of SW1/4, NW1/4, and S'/ S 2SE' /4 <br />Section 15: All <br />Section 16: Portions of W' /2NW1/4, SE' /4NW1/4, NE1/4SWV4, and SE'% <br />Section 21: Portions of E'/2NE1/4 <br />Section 22: NW1/4, NE1/4, N'/2SE1/4 , SW'/4SE1/4, Portions of N1/2SWV4, and <br />SW' /4SE'/4 <br />Section 23: NW' /4, SW1/4, W' /2E'/2, and W'/2E'/2E1/2 <br />Section 26: W' /2, W' /2E'/2, and Portions of W' /2E'/2NE'/4 and W' /2E' /2SE' /4 <br />Section 27: E1/2 <br />Section 34: NE' /4, N VSE' /4. and Portions of N' /2S1/2 SE <br />Section 35: NW1/4, W' /2NE' /4, NV2SW' /4 and Portions of N1/2S1/2SW1/4, <br />N W' /4SE' /4, NW1/4SW'/4SE1/4, N W' /4NE' /4SE %. and W' /2E'V2NE' /4 <br />All located west of the 6th Principal Meridian; totaling 3,878.5 acres. <br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of <br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. This Phase <br />I release will apply only to those areas where backfilling and grading are complete, including permanent <br />roads and other approved permanent structures, in accordance with the approved reclamation plan, has <br />been completed. "The areas requested for bond release were backfilled and graded from the beginning of <br />mining, in 1990 to date in accordance with the Colorado Division of Reclamation, Mining and Safety <br />rules and regulations. <br />A copy of the Bond Release application is available for public inspection at the Hayden Public Library. <br />201 E. Jefferson Avenue, Hayden, Colorado 81639. Written comments or objections or requests for <br />public hearing or informal conference concerning this application may be submitted to. and additional <br />information obtained from, the Colorado Division of Reclamation, Mining and Safety, 1313 Sherman <br />Street, Room 215, Denver, Colorado 80203 -2273, (303) 866 -3567. Comments must be received within <br />30 days of the last publication of this notice or within 30 days of the onsite inspection, whichever is later. <br />Sincerely, <br />Roy A. Karo <br />Reclamation Manager <br />Seneca Coal Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.