Laserfiche WebLink
Seneca 11-W SL -4 Bond Release <br />Page 2 <br />T5N, R88W <br />Section 9: Portions of SE3/4NE3/4, NE3/4SE1/4, and W1/2NE1/4 <br />Section 10: S1/2S1/2NW1/4, SW' /4, SE3/4, Portions of S1/2NE1/4 <br />Section 11: Portions of S'/2S' /SW'/ <br />Section 14: Portions of SW' /4, NW' , and S 2S'/2SE'/4 <br />Section 15: All <br />Section 16: Portions of W1/2NW3/4, SPAN NE,3/4SW3/4, and SE3/4 <br />Section 21: Portions of E1/2NE3/4 <br />Section 22: NW' /4, NE' /4, N1/2SE1/4 , SW' SE` /4. Portions of N1/2SW3/4, and <br />SW`/4SE' /4 <br />Section 23: NW3/4, SW3/4, W1/2E1/2, and W1/2E1/2E1/2 <br />Section 26: W1/2, W1/2E1/2, and Portions of W1/2E1/2NE1/4 and W1/2E1/2SE3/4 <br />Section 27: E'/ <br />Section 34: NE' 4, N1/2SE3/4, and Portions of N V2S'/ SE 1/4 <br />Section 35: NW3/4, W1/2NE3/4, N' /2SW' /4 and Portions of N`/2SV2SW' /4, <br />NW1/4SE3/4, NW3/4SW3/4SE3/4, NW1/4NE1/4SE3/4, and W1/2E1/2NE1/4 <br />All located west of the 6th Principal Meridian; totaling 3,878.5 acres. <br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of <br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. This Phase <br />I release will apply only to those areas where backfilling and grading are complete, including permanent <br />roads and other approved permanent structures, in accordance with the approved reclamation plan, has <br />been completed. The areas requested for bond release were backfilied and graded from the beginning of <br />mining, in 1990 to date in accordance with the Colorado Division of Reclamation, Mining and Safety <br />rules and regulations. <br />A copy of the Bond Release application is available for public inspection at the Hayden Public Library, <br />201 E. Jefferson Avenue, Hayden, Colorado 81639. Written comments or objections or requests for <br />public hearing or informal conference concerning this application may be submitted to, and additional <br />information obtained from, the Colorado Division of Reclamation, Mining and Safety, 1313 Sherman <br />Street, Room 215, Denver, Colorado 80203 -2273, (303) 866 -3567. Comments must be received within <br />30 days of the last publication of this notice or within 30 days of the onsite inspection, whichever is later. <br />Sincerely, <br />Roy A. Karo <br />Reclamation Manager <br />Seneca Coal Company <br />