Laserfiche WebLink
041 <br />Replace Topsoil from Stockpile B to Shop <br />SCRAPER <br />2 <br />15.70 <br />$25,895.79 <br />Area <br />1 <br />043 <br />Replace Topsoil from Stockpile Haul Fill <br />SCRAPER <br />2 <br />30.18 <br />$49,789.13 <br />from to Neck Pit <br />1 <br />044 <br />Replace Topsoil from Stockpile I to <br />SCRAPER <br />2 <br />57.67 <br />$95,143.85 <br />Entrance Road and Wadge <br />1 <br />046 <br />Replace Topsoil from Stockpile L to <br />SCRAPER <br />2 <br />73.72 <br />$121,619.23 <br />Unreleased Pond 12 Area <br />1 <br />049 <br />2 <br />$59,378.09 <br />Replace Topsoil from Stockpile P to Pond <br />SCRAPER <br />35.99 <br />13 Slide Area <br />1 <br />04a <br />2 <br />$21,038.83 <br />Grade Remaining Valora Pit N/S Spoil <br />DOZER <br />23.68 <br />Ridges <br />Grade Remaining Valora Pit E/W (Scraper <br />DOZER <br />25.20 <br />04b <br />2 <br />$22,396.18 <br />Pit) Spoil Ridges <br />Replace Topsoil from Stockpile to MR -18 <br />DOZER <br />0.63 <br />052 <br />2 <br />$560.80 <br />Drill Pads <br />053 <br />Replace Topsoil from Stockpile to MR -18 <br />DOZER <br />2 <br />0.24 <br />$212.82 <br />Access Road <br />054 <br />Replace Topsoil from Stockpile to Pond <br />DOZER <br />2 <br />0.23 <br />$203.82 <br />010 Access Road <br />Seal All Monitoring Wells and <br />BOREHOL <br />204.00 <br />060 <br />1 <br />$57,404.73 <br />Exploration Holes <br />E <br />065 <br />1 <br />$73,226.68 <br />Drill Seed Mix 1 <br />REVEGE <br />173.90 <br />066 <br />Drill Seed mix 2 <br />REVEGE <br />1 <br />19.00 <br />$11,394.98 <br />067 <br />1 <br />$13,258.15 <br />Drill Seed Mix 3 <br />REVEGE <br />10.00 <br />068 <br />1 <br />$15,100.28 <br />Broadcast Seed Mix 1 <br />REVEGE <br />13.00 <br />069 <br />Broadcast Seed Mix 5 <br />REVEGE <br />1 <br />5.00 <br />$15,931.10 <br />070 <br />1 <br />$41,193.40 <br />Shrub /Tree Planting - List 1 - Areas NOT <br />REVEGE <br />20.00 <br />Released <br />071 <br />Shrub /Tree Planting - List 1 - Replant <br />REVEGE <br />1 <br />41.60 <br />$76,776.44 <br />Areas Released <br />072 <br />Drill Seed Cover Crop <br />REVEGE <br />1 <br />242.90 <br />$23,588.02 <br />073 <br />1 <br />$18,603.40 <br />Drill Seed Mix IB on Haul Road and <br />REVEGE <br />40.00 <br />Deadhead Road Corridor <br />074 <br />Drill Seed Mix 1 - Reseed Phase 11 Areas- <br />REVEGE <br />1 <br />592.70 <br />$177,128.40 <br />100% of 592.7 Acre <br />080 <br />Rill and Gully and Road Maintenance <br />SITEMAIN <br />1 <br />0.00 <br />$225,878.00 <br />TENANCE <br />081 <br />Clean Sediment Ponds 010, 011, 011A, <br />TRUCKI <br />1 <br />291.74 <br />$115,049.56 <br />012, 012A and 014 Twice <br />Mobilize /Demobilize Equipment for <br />MOBILIZE <br />3.33 <br />085 <br />1 <br />$10,141.90 <br />Initial Reclamation <br />086 <br />Mobilize /Demobilize Equipment for Pond <br />MOBILIZE <br />1 <br />3.33 <br />$2,651.67 <br />Removal <br />087 <br />Mobilize/Demobilize Equipment for Site <br />MOBILIZE <br />1 <br />11.33 <br />$53,921.36 <br />