Laserfiche WebLink
November 7, 2012 C-1983-059/Terror Creek Loadout JRS <br /> ROADS —Rule 4.03 Construction 4.03.1(3)/4.03.2(3)Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5)and(6)/4.03.2(5) and(6) Reclamation 4.03.1(7)/4.03.2(7): <br /> -The haul road from the loadout entrance to the truck scale is a paved road. This road was well maintained and <br /> stable. There were no problems noted with the road or the road embankments. The remaining haul road, from the <br /> scale to the truck dump and back to the paved portion of the road, is a dirt road. This road was stable and well <br /> maintained as well and no problems were noted. <br /> DOCUMENTS RECEIVED: None <br /> This concludes the 7 November 2012 partial inspection report for the Terror Creek Loadout <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 4 <br />