Laserfiche WebLink
L___ <br />1 EMP -018 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />ECA <br />KIP 1_0 <br />So1- SA <br />ti <br />ESHOB <br />\ 6 0 HDPE <br />\ \ <br />\ SDR17Pipe/ine <br />rest Replaced with Open <br />\ Ditch after WHEX - <br />�'ti -- is backfilled <br />\\ �Z�_l� \f��■titi[i <br />Normal Withdrawal 0.7Acre feet <br />/ with 3- SolarPumps in Parallel <br />i l <br />@ Sgpm /40 psi <br />\ Storm withdrawal 2.6Acre feet - - -� <br />' using Mobile /Diese120 HP Pump <br />_ - <br />�at 1 cfs /110 ft TDH t� <br />j•' •� e e��LiN�r�- <br />Emergency Spillway for EMP - lyti u <br />Backflowfrom Pond through Ditchx <br />Total Earthwork _ \ <br />Balanced Cat/Fill - 8,200 CY - <br />6'0 Riser Pipe <br />Spillway with NO <br />j 6- PO Perforations <br />atl2"centers <br />I� <br />Cut 4 it below <br />grade and build <br />Embankment <br />to Elev. 100.5.5 to <br />provide 9.9 Acre feet <br />Capacity <br />j Note: EMP -019is <br />Temporary and will be <br />removed by WHEX. It will <br />be replaced after WHEX <br />\ <br />Backfill with Permanent <br />; EMP -019 <br />_ Plan View <br />1 "=50'(D-Size Dwg) <br />EMP- 017N- Coarse Sediment - <br />Trap - Upgrade Existing pond as <br />needed. Pond will remove all Sand <br />and coarse SiltBasing B -1, GZ and EMP- 017Main - Rehabilitate <br />outfall from EMP -016 Existing Cameron Pond for Total <br />Designedfor Sediment Removal �8ss Capacityof19.7AcrcFeet Pond `• <br />efficiency. EFn serves as Clear-water pool and <br />dE source for dust - control & <br />�--� construction water <br />P <br />1 <br />12 "Outlet Riser with <br />Inlet at El. 10014. Routes ` <br />and reduces flow to EMP- 019Main \ <br />to 6 cis for improved settling <br />effectiveness. <br />O /III <br />\ , 6" Lrnw -level <br />100- I rS P illwa y to � Drahn an <br />d Riprap <br />-water Pump System to Spilhway <br />EMP- 17Cear <br />Evacuate EMP- 017anduse <br />\ 6) Grass lined Interceptor water for Dust Control and \ \ \ <br />for Basin ECOSA -C2 Construction water \ l <br />EMP - 0175 - Coarse <br />Sediment Trap for Basin ECOSA-DI From Basin <br />Existing pond upgraded as ECOSA -Dl <br />necessary. e � <br />Eon \ \ <br />1 <br />4 r -)EMP -017 (Rebuilt Cameron Ponds) <br />Plan View <br />1 " =50' (D -Size Dwg) <br />Notes and General Specifications: <br />1. The dimensions and construction of ditches are listed on Tables at <br />right, along with the armoring requirements (3" Riprap, 6" Riprap or <br />vegetated channels). The freeboard includes a minimum of 6- inches <br />at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP Ponds and their embankments are intended to be water tight <br />because of their proximity to high walls of the mining areas. <br />Accordingly, they shall be constructed to conform to the following <br />general specifications: <br />a. Strip the footprint of the pond area down to suitable non - organic <br />soi /s with no less than 15 -20% fines ( <200 mesh). Proof roll the <br />footprint and compact as needed to achieve a target density of no less <br />than 90% in the basin and no less than 95% Std Proctor in the <br />embankmant. <br />b. Select soils for the embankment that have at least 15% fines. <br />Place and compact the embankment soils in 8 -inch maximum loose <br />layers and compact to at least 95% Std. Proctor density. <br />a Maximum slope of embankment shall be 2 :1. Maximum slope <br />inside sediment basin shall be 1.75-1. Maximum slope of reseeded <br />areas shall be 3 :1. <br />3. An emergency spillway shall be constructed at each pond with a <br />finished invert elevation approximately 2.0 feet lower than the crest <br />and a base width of 6.0 feet. The spillway shall be armored with 6" <br />angular nprap place on 6- inches of sandy-gravel bedding and a layer <br />of Mirlfl drain fabric. <br />EUE <br />21MS <br />a� <br />Q Q, ^n t .n -/ <br />Total Earthwork <br />Balanced CutlFill -3,000 CY <br />North Interceptor at <br />Toe ofECOSA <br />Embankment <br />South Interceptor <br />at Toe ofECOSA embankment <br />5 EMP -020 <br />Plan View <br />1 "=50'(D-Size Dwg) <br />Grassy Valley Storm Water Management Area <br />Wild Horse Extension (WHEX) and ECOSA - Transfer Pumps -1 R <br />Temporary -- gpm Solar & One cis <br />-- Basmi Basin Mobile @ 100ftTDH <br />.A <br />Basin WHEX - WHEX-B1 <br />Vindicator <br />WHEX -D Basin _ <br />i� VIN-A 1 Basin <br />Basin EMP -01, <br />WHEX -C 5.7AF <br />EMP -010 Temporaryr <br />`------- - - - - -- <br />3. Basin <br />asin <br />WHFX -F <br />9.9AF <br />Basin <br />ECOSA Al <br />Perforated <br />Weep Pipe_ EMP -01i <br />Drain 52AF <br />J Basin <br />ECOSA-81 <br />Sed EMP -017/ <br />Basin Tra 19.7AF <br />-40 0 0 M M 0 0 E M MIL EMP -013 Spillway <br />■ 1.BAF <br />■ <br />Spillway ■ <br />■ After WHEY <br />■ Backfill, Grassy <br />1 ■ Valley is Restored & <br />■ Highway Basins <br />Perforated ■ ilowDirect to <br />�i Weep Pipe 0 Grassy Creek <br />Drain ■ wlo Detention <br />■ Basin <br />■ ECOSA-E1 <br />■ <br />Spillwa <br />■ EMP -020 y <br />Basin ■ 9-0AF <br />i way ECOSA-D7 ■ <br />- ■ V <br />10 Upper Grasser Valley Storm Water Management Area <br />Schematic <br />a <br />ETW, <br />Existing <br />Riprap Lined <br />Channel <br />from EMP-10 \ <br />Construct Perforated Riser <br />Spillway - 610 Pipe with <br />ea. 1 k3 Perf. @ 12" Centers <br />�E4A <br />�A= <br />-\ - Edstin EMP -016 <br />eF Verify Capacity at <br />5.2 Acre feet <br />\\\ V6 <br />AF -qwI <br />Channel from NW Toe <br />I, ! ofE <br />3 Existing EMP -016 <br />Plan View <br />1 "=50'(D-Size Dwg) <br />Total Earthwork <br />Balanced CutlKll - 16,000 CY <br />Pond Capacity 9Acre Feet <br />a <br />EMP- <br />Name <br />1024 <br />Area <br />Base <br />(Ac) <br />-EMP-018 <br />Capacity <br />@Crest <br />(Ac -Ft) <br />Outlet <br />Pipe <br />(in) <br />E Spillway <br />Width <br />(ft) <br />Spillway <br />Elev. <br />4 <br />EMP -18 <br />10200 <br />7po <br />.55 <br />57 <br />6 "S <br />i <br />10204.0 <br />,I <br />L___ <br />1 EMP -018 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />ECA <br />KIP 1_0 <br />So1- SA <br />ti <br />ESHOB <br />\ 6 0 HDPE <br />\ \ <br />\ SDR17Pipe/ine <br />rest Replaced with Open <br />\ Ditch after WHEX - <br />�'ti -- is backfilled <br />\\ �Z�_l� \f��■titi[i <br />Normal Withdrawal 0.7Acre feet <br />/ with 3- SolarPumps in Parallel <br />i l <br />@ Sgpm /40 psi <br />\ Storm withdrawal 2.6Acre feet - - -� <br />' using Mobile /Diese120 HP Pump <br />_ - <br />�at 1 cfs /110 ft TDH t� <br />j•' •� e e��LiN�r�- <br />Emergency Spillway for EMP - lyti u <br />Backflowfrom Pond through Ditchx <br />Total Earthwork _ \ <br />Balanced Cat/Fill - 8,200 CY - <br />6'0 Riser Pipe <br />Spillway with NO <br />j 6- PO Perforations <br />atl2"centers <br />I� <br />Cut 4 it below <br />grade and build <br />Embankment <br />to Elev. 100.5.5 to <br />provide 9.9 Acre feet <br />Capacity <br />j Note: EMP -019is <br />Temporary and will be <br />removed by WHEX. It will <br />be replaced after WHEX <br />\ <br />Backfill with Permanent <br />; EMP -019 <br />_ Plan View <br />1 "=50'(D-Size Dwg) <br />EMP- 017N- Coarse Sediment - <br />Trap - Upgrade Existing pond as <br />needed. Pond will remove all Sand <br />and coarse SiltBasing B -1, GZ and EMP- 017Main - Rehabilitate <br />outfall from EMP -016 Existing Cameron Pond for Total <br />Designedfor Sediment Removal �8ss Capacityof19.7AcrcFeet Pond `• <br />efficiency. EFn serves as Clear-water pool and <br />dE source for dust - control & <br />�--� construction water <br />P <br />1 <br />12 "Outlet Riser with <br />Inlet at El. 10014. Routes ` <br />and reduces flow to EMP- 019Main \ <br />to 6 cis for improved settling <br />effectiveness. <br />O /III <br />\ , 6" Lrnw -level <br />100- I rS P illwa y to � Drahn an <br />d Riprap <br />-water Pump System to Spilhway <br />EMP- 17Cear <br />Evacuate EMP- 017anduse <br />\ 6) Grass lined Interceptor water for Dust Control and \ \ \ <br />for Basin ECOSA -C2 Construction water \ l <br />EMP - 0175 - Coarse <br />Sediment Trap for Basin ECOSA-DI From Basin <br />Existing pond upgraded as ECOSA -Dl <br />necessary. e � <br />Eon \ \ <br />1 <br />4 r -)EMP -017 (Rebuilt Cameron Ponds) <br />Plan View <br />1 " =50' (D -Size Dwg) <br />Notes and General Specifications: <br />1. The dimensions and construction of ditches are listed on Tables at <br />right, along with the armoring requirements (3" Riprap, 6" Riprap or <br />vegetated channels). The freeboard includes a minimum of 6- inches <br />at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP Ponds and their embankments are intended to be water tight <br />because of their proximity to high walls of the mining areas. <br />Accordingly, they shall be constructed to conform to the following <br />general specifications: <br />a. Strip the footprint of the pond area down to suitable non - organic <br />soi /s with no less than 15 -20% fines ( <200 mesh). Proof roll the <br />footprint and compact as needed to achieve a target density of no less <br />than 90% in the basin and no less than 95% Std Proctor in the <br />embankmant. <br />b. Select soils for the embankment that have at least 15% fines. <br />Place and compact the embankment soils in 8 -inch maximum loose <br />layers and compact to at least 95% Std. Proctor density. <br />a Maximum slope of embankment shall be 2 :1. Maximum slope <br />inside sediment basin shall be 1.75-1. Maximum slope of reseeded <br />areas shall be 3 :1. <br />3. An emergency spillway shall be constructed at each pond with a <br />finished invert elevation approximately 2.0 feet lower than the crest <br />and a base width of 6.0 feet. The spillway shall be armored with 6" <br />angular nprap place on 6- inches of sandy-gravel bedding and a layer <br />of Mirlfl drain fabric. <br />EUE <br />21MS <br />a� <br />Q Q, ^n t .n -/ <br />Total Earthwork <br />Balanced CutlFill -3,000 CY <br />North Interceptor at <br />Toe ofECOSA <br />Embankment <br />South Interceptor <br />at Toe ofECOSA embankment <br />5 EMP -020 <br />Plan View <br />1 "=50'(D-Size Dwg) <br />Grassy Valley Storm Water Management Area <br />Wild Horse Extension (WHEX) and ECOSA - Transfer Pumps -1 R <br />Temporary -- gpm Solar & One cis <br />-- Basmi Basin Mobile @ 100ftTDH <br />.A <br />Basin WHEX - WHEX-B1 <br />Vindicator <br />WHEX -D Basin _ <br />i� VIN-A 1 Basin <br />Basin EMP -01, <br />WHEX -C 5.7AF <br />EMP -010 Temporaryr <br />`------- - - - - -- <br />3. Basin <br />asin <br />WHFX -F <br />9.9AF <br />Basin <br />ECOSA Al <br />Perforated <br />Weep Pipe_ EMP -01i <br />Drain 52AF <br />J Basin <br />ECOSA-81 <br />Sed EMP -017/ <br />Basin Tra 19.7AF <br />-40 0 0 M M 0 0 E M MIL EMP -013 Spillway <br />■ 1.BAF <br />■ <br />Spillway ■ <br />■ After WHEY <br />■ Backfill, Grassy <br />1 ■ Valley is Restored & <br />■ Highway Basins <br />Perforated ■ ilowDirect to <br />�i Weep Pipe 0 Grassy Creek <br />Drain ■ wlo Detention <br />■ Basin <br />■ ECOSA-E1 <br />■ <br />Spillwa <br />■ EMP -020 y <br />Basin ■ 9-0AF <br />i way ECOSA-D7 ■ <br />- ■ V <br />10 Upper Grasser Valley Storm Water Management Area <br />Schematic <br />a <br />ETW, <br />Existing <br />Riprap Lined <br />Channel <br />from EMP-10 \ <br />Construct Perforated Riser <br />Spillway - 610 Pipe with <br />ea. 1 k3 Perf. @ 12" Centers <br />�E4A <br />�A= <br />-\ - Edstin EMP -016 <br />eF Verify Capacity at <br />5.2 Acre feet <br />\\\ V6 <br />AF -qwI <br />Channel from NW Toe <br />I, ! ofE <br />3 Existing EMP -016 <br />Plan View <br />1 "=50'(D-Size Dwg) <br />Total Earthwork <br />Balanced CutlKll - 16,000 CY <br />Pond Capacity 9Acre Feet <br />a <br />6"0 Riser Pipe <br />15' 6 ea. 1 "'0 Holes at <br />12" Vertical Centers Depth <br />nom <br />( <br />Crest Area (Ac) 2 t . ft <br />2 2 1 <br />� � <br />- Sp#&My '.. <br />i � � EtevaNeon <br />�- .. : .. <br />Base Area (Ac) <br />Sediment Allowance <br />(2 ft. typ) Pond Dimensions <br />SEDCAD <br />Structure <br />ID <br />EMP- <br />Name <br />1024 <br />Area <br />Base <br />(Ac) <br />-EMP-018 <br />Capacity <br />@Crest <br />(Ac -Ft) <br />Outlet <br />Pipe <br />(in) <br />E Spillway <br />Width <br />(ft) <br />Spillway <br />Elev. <br />4 <br />EMP -18 <br />10200 <br />7po <br />.55 <br />57 <br />6 "S <br />6 <br />10204.0 <br />7 <br />EMP -10 <br />W <br />.20 <br />.55 <br />3.9 <br />None <br />Natural Slope <br />10125 -0 <br />9 <br />EMP -19 <br />10160 <br />Natural <br />1.72 <br />9.9 <br />6 "P <br />X <br />10055.0 <br />11 <br />EMP -16 <br />10120 <br />Slope <br />WHEX Mine <br />Area Backfill <br />6"P <br />Cut through <br />�, Ridge ° <br />10039.0 <br />15 <br />EMP -17N <br />10080 <br />.131 <br />283 <br />1.6 <br />12 "S <br />10.0 <br />10018.0 <br />16 <br />EMP -17M <br />10040 <br />-88 <br />1 -57 <br />19.7 <br />None <br />6.0 <br />9989.0 <br />S2 <br />EMP 20 <br />100W <br />0 r\ <br />w rn <br />cfl o <br />None <br />o o t\ o i, N rn <br />rn co <br />V1 <br />EMP -13 <br />DATUM E7L 9 <br />N <br />.27 <br />o <br />None <br />ai ri co N co %__: (o <br />10100.0 <br />10 <br />EC -A <br />20 <br />45 <br />4.2 <br />_ <br />1.1 <br />m to N <br />i7 c� <br />12 <br />EC -B <br />N <br />99� 0. 00 0 <br />N ti <br />0 0 0 <br />`- A <br />0 0 0 <br />�- <br />0 0 <br />_ <br />N <br />0 <br />N <br />0 0 0 0 0 0 0 0 <br />0 0 <br />Pipe <br />EC -C <br />A <br />n R• n <br />A A n <br />n n <br />n <br />n A n <br />13 <br />ED -G <br />0 +00 5 +00 <br />10 +00 15 +00 20 +00 <br />25 +00 30 +00 35 +00 40 +00 <br />45 +00 <br />.9 <br />PROFILE B, <br />�7) <br />SHEET 3- Reconstructed <br />Stream <br />Corridor Across WHEX after Backfill <br />10 <br />21 <br />Profile View <br />1" =500 ft (DSize) <br />4 <br />.9 <br />1.7 <br />6 <br />S1A <br />EC -E <br />6"0 Riser Pipe <br />15' 6 ea. 1 "'0 Holes at <br />12" Vertical Centers Depth <br />nom <br />( <br />Crest Area (Ac) 2 t . ft <br />2 2 1 <br />� � <br />- Sp#&My '.. <br />i � � EtevaNeon <br />�- .. : .. <br />Base Area (Ac) <br />Sediment Allowance <br />(2 ft. typ) Pond Dimensions <br />SEDCAD <br />Structure <br />ID <br />EMP- <br />Name <br />Depth <br />(t) <br />Area <br />Base <br />(Ac) <br />Nea <br />Crest <br />(Ac) <br />Capacity <br />@Crest <br />(Ac -Ft) <br />Outlet <br />Pipe <br />(in) <br />E Spillway <br />Width <br />(ft) <br />Spillway <br />Elev. <br />4 <br />EMP -18 <br />15 <br />-22 <br />.55 <br />57 <br />6 "S <br />6 <br />10204.0 <br />7 <br />EMP -10 <br />W <br />.20 <br />.55 <br />3.9 <br />None <br />6.0 <br />10125 -0 <br />9 <br />EMP -19 <br />10 <br />.375 <br />1.72 <br />9.9 <br />6 "P <br />6 -0 <br />10055.0 <br />11 <br />EMP -16 <br />15 <br />.21 <br />.76 <br />5.2 <br />6"P <br />6 <br />10039.0 <br />15 <br />EMP -17N <br />8 <br />.131 <br />283 <br />1.6 <br />12 "S <br />10.0 <br />10018.0 <br />16 <br />EMP -17M <br />15 <br />-88 <br />1 -57 <br />19.7 <br />None <br />6.0 <br />9989.0 <br />S2 <br />EMP 20 <br />15 <br />.39 <br />.84 <br />9.0 <br />None <br />6.0 <br />99425 <br />V1 <br />EMP -13 <br />10 <br />.10 <br />.27 <br />1.8 <br />None <br />60 <br />10100.0 <br />Notes: <br />1. Select Ponds include outlet risers consisting of 6" HDPE' Pipe and <br />1 "0` perforations, 6 per row, at 12 -inch intervals. <br />2. Pond sizes include 2 ft. deep allowance for sediment actcumulation- <br />3. Emergency Spillways are generally 24- inches below crest. <br />4. EMP Ponds with Perforated Outlet drains are not terminal facilities <br />and may be designed for one 10 yr /24 -hr storm volume since their <br />contents are automatically evacuated to a terminal storage ibasin. <br />r�EMP- Pond Dimensions <br />Table <br />Fbd <br />QH 4 <br />' <br />Width <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />SEDCAD <br />Channel <br />ID <br />Channel <br />Name <br />10 -Yr <br />Flow <br />cfs <br />100 -yr <br />(lob <br />cfs <br />Avg. <br />dope <br />Bottom <br />Width (R) <br />Flow <br />Depth <br />Chan. <br />Depth <br />RipRap <br />D50(nom) <br />1 <br />WH A <br />9 <br />17 <br />5.8 <br />4 <br />1.5 <br />2.6 <br />3 <br />2 <br />WH B <br />14 <br />27 <br />3.1 <br />4 <br />.7 <br />1.5 <br />3 <br />3 <br />WH -C1 <br />6 <br />15 <br />70 <br />4 <br />.6 <br />1.5 <br />3 <br />WH -C2 <br />23 <br />44 <br />8.0 <br />4 <br />1.0 <br />2.3 <br />6 <br />6 <br />WH -D <br />22 <br />46 <br />10.7 <br />7 <br />a 8 <br />2.0 <br />6 <br />8 <br />WH -E <br />60 <br />120 <br />3.3 <br />6.5 <br />1.8 <br />3.0 <br />6 <br />WH -F <br />2.5 <br />3.4 <br />5.0 <br />4 <br />0.5 <br />1.5 <br />6 <br />Pipe <br />MP -18 <br />1 <br />1 <br />6 "PE <br />10 <br />EC -A <br />20 <br />45 <br />4.2 <br />4 <br />1.1 <br />2.3 <br />6 <br />12 <br />EC -B <br />55 <br />106 <br />11.5 <br />6 <br />1.4 <br />3.1 <br />6 <br />Pipe <br />EC -C <br />6 <br />6 <br />8 <br />12'PE <br />13 <br />ED -G <br />10 <br />26 <br />1.4 <br />4 <br />.9 <br />1.7 <br />6 <br />14 <br />EC -D <br />10 <br />21 <br />1.4 <br />4 <br />.9 <br />1.7 <br />6 <br />S1A <br />EC -E <br />21 <br />42 <br />4.7 <br />4 <br />1.1 <br />23 <br />6 <br />SIB <br />ED -F <br />41 <br />84 <br />4.7 <br />8 <br />1.1 <br />2.5 <br />6 <br />V1 <br />VIA <br />10 <br />36 <br />25 <br />6 <br />0.6 <br />2.1 <br />6 <br />g)Table Channel Dimensions and Design Specifications <br />Runoff from 6r' HDPE Pi ellne EMP -17 <br />Brow Ditch along p Cameron Ponds <br />Crest of WHEX Mine Area County Road from EMP -18 to <br />10320 EMP-16 (SDR17) EMP -19 Reconstructed to <br />10280 Receive water from all <br />10240 ' - [existing] EMP- s for reuse as <br />�_ <br />10200 _ 2 tt Vent at �_, Construction Water <br />10160 High Point EMP -16 <br />10120 <br />EMP -18 with7.SHP [existing] <br />10080 <br />10040 Transfer Pump �'� <br />- <br />0 0 o M >� o N 0*) m o tp M I. t\ to N o o N o d. - -- � - -- rn co <br />DATUM EL91� " o ai ai ni of ad cd <r ai o N cri o tti cD N N cfl ai ao tri tri tti co M o 0 <br />01 0[) t[7 N O t\ 0t1 M M Ott f\ l[1 t�j OC1 tt) M OO M M M M <br />M so W W w w N N N N N N N N t` - 0 0 0 0 r3 0 0 0 0 O o o <br />9<9f30.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C3 0 0 0 0 0 <br />0 +00 5 +00 10 +00 15 +00 20 +00 25 +00 30 +00 35 +00 40 +00 45 +00 50 +00 55 +00 60 +00 65 +00 70 +00 75 +00 80 +00 <br />PROFILE A SHEET 3- Grassy Valley Storm Water Channel and EMP- Ponds <br />Profile View <br />1 " =500 ft (DSize) <br />