Laserfiche WebLink
G u G CONSULTING <br />ENGINEERING <br />Llmited Liability Company <br />Table of Contents <br />Figures <br />Figure 1 Well and Sampling Locations <br />Figure 2 Time Versus Concentration Plot, TDS <br />Tables <br />PO 984, Kittredge, CO 80457 <br />303 918 9422 <br />INTRODUCTION 2 <br />WORK PERFORMED 2 <br />RESULTS AND DISCUSSION 3 <br />General Chemistry (Sulfate and TDS) 3 <br />Field Parameters 4 <br />Quality Control 4 <br />CONCLUSIONS 4 <br />GENERAL CONDITIONS 6 <br />Table 1 Results of Third Quarter, 2012, Groundwater Monitoring, GCC Rio Grande, <br />Inc., Pueblo Cement Plant, Pueblo, Colorado. Sampling Conducted <br />September 26, 2012. <br />Table 2 Results History for TDS, Groundwater Monitoring, GCC Rio Grande, Inc., <br />Pueblo Cement Plant, Pueblo, Colorado. <br />Appendix A <br />Report # Content <br />D39156 General Chemistry analytical data for wells MW002, MW004, and DUP -01 <br />1 <br />