My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-05_HYDROLOGY - C2009087 (4)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C2009087
>
2012-11-05_HYDROLOGY - C2009087 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:18 PM
Creation date
11/14/2012 1:35:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
HYDROLOGY
Doc Date
11/5/2012
Doc Name
3rd Quarter 2012 Sedimentation Pond Inspection
From
Peabody Sage Creek Mining, LLC
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTOR'S NAME: Dennis Jones <br />FACILITY CONFIGURATION: Diked Pond <br />SITE NAME: Upper Sump <br />MINE NAME: Peabody Sage Creek Mine <br />MINE I.D. NO.: CDRMS Permit No. C- 2009 -087 <br />PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />DATE: 9- ' 0 - (Z / / <br />DATE LAST INSPECTION: b -is <br />S <br />LOCATION: NW /,, Sec. 3, T5N, R87W <br />LOCATION: 7.1 mi. SE of Hayden, CO <br />OWNER'S REP.: Mike Ludlow <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: in. <br />3. Compaction according to approved plan: Yes <br />4. Burning (specify extent and location): No <br />5. Angle of slope: upstream, downstream Total = <br />6. *Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: N/A <br />At isolated points on embankment slopes: Yes N N/A <br />At natural hillside: Yes N/A <br />Over widespread areas: Yes N/A <br />From downstream foundation area: N/A <br />"Boils" beneath stream or ponded water: Yes N/A <br />7. Cracks or scarps on crest: Yes N/A <br />8. Cracks or scarps on slope: Yes N/A <br />9. Sloughing or bulging on slope: Yes N/A <br />10. *Major erosion problems: Yes N/A <br />11. Surface movements in valley bottom or on hillside: Yes N/A <br />12. *Erosion of toe: Yes N/A <br />13. *Water impounded against toe: � Yes N N/A <br />14. Existing embankment freeboard: 1%.,01‘-‘1 1,2042-k c,e, I pv.:0 A . S5i We <br />15 . Increase Decrease in water level: t1 s c kc T.-0-- <br />16. Cracks, bulging, or erosion on upstream face: <br />17. Visible sumps or sinkholes in slurry surface: <br />18. *Clogging <br />Spillway channels and pipes: Yes 61.o. N/A <br />Decant system: N/A <br />Diversion ditches: Yes No <br />19. *Cracking or crushing of pipes <br />Spillway pipes: Yes N/A <br />Decant system: <br />20. Trash racks clear and in place: No N/A <br />21. Discharge rate (gpm) (A)4 ('•Q q tee. .ele c cu �1eu vk'� �e-` L <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />back of this sheet. <br />'s <br />0 <br />No <br />No <br />No <br />o <br />No <br />No <br />No <br />No <br />No <br />No <br />feet <br />feet <br />Yes No N/A <br />N/A <br />N/A <br />: C.uu,_ .A3G w e S\1 <br />(4,,, 4(A) oe <br />()42_,„ ,F.A. <br />v (( pp <br />
The URL can be used to link to this page
Your browser does not support the video tag.