Laserfiche WebLink
ilr <br />The operator recognizes that the sedimentation pond was being constructed contemporaneously <br />with initial ditch construction and topsoil stripping activity. Actions taken by the operator, including <br />the installation of silt fences, straw bales barriers and collector ditches prior to topsoil stripping <br />disturbances, have served to prevent any offsite or off permit discharge of sediment. Finally, <br />construction of the designed collector ditches are being finalized concurrent with final construction <br />of the sediment pond, to contain and convey potential runoff from disturbed areas into the pond. <br />Please let me know if you have any questions. <br />Operator Action: Upon final construction of Sedimentation Pond NHN -001, an engineer <br />certification will be completed and submitted to the Division as a Minor Revision to the <br />permit. <br />Douglas C. White, P.E. <br />Director of Technical Services <br />Cc: Ms. Sandra L. Brown, DRMS <br />Lance Wade, NHM, via email <br />Ross Gubka, NHM via email <br />