Laserfiche WebLink
Table 1 <br />Bond Release Acreage Figures <br />SL -1 <br />SL -2 <br />SL -3 <br />SL -4 <br />Proposed <br />Total <br />Phase I Released <br />173.02 <br />456.70 <br />0 <br />115.5 <br />745.22 <br />Phase II Released <br />0 <br />0 <br />592.00 <br />0 <br />592 <br />Phase III Released <br />0 <br />0 <br />0 <br />0 <br />0 <br />Bond Release Exclusions <br />SL -1 <br />SL -2 <br />SL -3 <br />SL -4 <br />Total <br />No Phase I Release <br />Requested <br />660.50 <br />159.78 <br />159.78 <br />48.18 <br />48.18 <br />Denied Phase I <br />15.08 <br />59.06 <br />NA <br />55.20 <br />55.20 <br />No Phase II <br />Release Requested <br />NA <br />NA <br />220.00 <br />NA <br />0 <br />Denied Phase II <br />NA <br />NA <br />36.60 <br />NA <br />0 <br />Note: Total disturbed acreage was 848.6 acres, including the Yoast <br />Access Road (74.8 acres). <br />Page 13 of 27 <br />Yoast Mine SL -4 <br />