My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-05_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2012-11-05_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:19 PM
Creation date
11/13/2012 2:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
11/5/2012
Doc Name
Letter & Application
From
Twentymile Coal Company
To
DRMS
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 24, 2012 <br />SIGNS AND MARKERS — Rule 4.02: <br />All nine identification signs, topsoil markers, stream buffer signs, and disturbed area markers observed were in <br />the correct location and displayed the required information. No problems were noted with the exception of the <br />following: <br />- Disturbed area markers were installed along the 16LT road since the last inspection. These markers will need to <br />be re- installed to delineate the correct disturbance boundary approved in the Foidel Creek Permit. <br />TOPSOIL — Rule 4.06 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />Topsoil redistribution has been completed at the Fish Creek Tipple site. A total of five topsoil depth <br />measurements were taken during this inspection. The topsoil depths were an average of 9.5" on the site. <br />The following topsoil stockpiles throughout the site will need to be addressed: <br />- The topsoil stockpile along the 19RT access road will need to be managed for weeds. Both houndstounge and <br />\vhttetop were observed. This pile may require additional interseeding to aid in the stability of the pile. <br />- The recent placement of the topsoil at the topsoil stockpile on the 6MN pad will require seeding to establish a <br />good stability controlled cover. <br />- The topsoil stockpile along the Fish Creek Borehole access road will require weed management and reseeding. <br />DOCUMENTS RECEIVED April 2012 DMR, Correspondence letter from CPW for MR261 <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br />C- 1982 - 056 / Foidel Creek Mine <br />Page 6 of 8 <br />JDM <br />
The URL can be used to link to this page
Your browser does not support the video tag.