My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-05_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2012-11-05_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:19 PM
Creation date
11/13/2012 2:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
11/5/2012
Doc Name
Letter & Application
From
Twentymile Coal Company
To
DRMS
Type & Sequence
SL1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Batch- Weigh/Loadout System <br />Reclamation of the batch -weigh system coal stockpile area, conveyor areas, and batch- weigh/loadout building site will <br />be accomplished according to the existing Reclamation Timetable (Table 52) in Permit C -82 -056. All structures will <br />be removed from the site, with the exception of the reclaim tunnel. Concrete foundation materials will either be <br />disposed of in the reclaim tunnel, or will be transported to the portal highwall cut, and buried. That portion of the <br />reclaim tunnel which is above grade, will be broken -up. That portion of the reclaim tunnel which is below grade will <br />be demolished to a depth of approximately 3 feet, the tunnel will be filled with the resulting demolition debris and <br />overburden materials, and the tunnel will then be abandoned in place. <br />Reclamation of the batch -weigh system coal stockpile site will involve reconfiguring the site in order to reestablish <br />premining contours. During construction of the batch -weigh loadout system facilities, fill material may be removed <br />from the site for use in the realignment of CR 27. In order to reestablish premining contours, TCC will replace an <br />equivalent volume of material at the batch -weigh loadout system site during final reclamation. The replacement <br />material will consist of spoil obtained during regrading operations in the area south of the existing portals and <br />associated facilities at the Foidel Creek Mine. The volume of replacement material potentially required (maximum <br />12,000 cubic yards) will have no discernible impact on the final regraded configuration proposed for the source area <br />described. After respreading the cover materials, topsoil will be respread. Calculations indicate that 2,500 cubic <br />yards of topsoil salvaged from the site will be respread. The respread topsoil will be prepared for seeding and will be <br />seeded according to the approved reclamation plan for similar adjacent areas. Postmining topography for the area will <br />approximate that shown on Map 31, Postmining Topography. <br />7 -North Escape Shaft <br />When the facility is no longer required, the shaft will be plugged, the site graded, topsoiled, and revegetated. A <br />number of steps will be required to abandon the shaft, including removal of surface structures, demolition of concrete <br />foundation and piers, and sealing of shaft. After the surface structure is removed, the broken -up foundation and piers <br />will be put down the shaft. Upon completion of this work, decking will be suspended in the shaft 10 feet below - grade. <br />The support beams and decking will be suspended from the steel casing by steel straps (i.e. I -beams or similar support <br />structures) welded to the support beams. The steel straps will be welded to the existing 48 -inch diameter casing. <br />Once this is completed, a 24 -inch thick reinforced concrete slab will be poured in -place over the previously placed <br />decking. The void from on top of the concrete slab to within 5 feet of the surface will be backfilled with fill material <br />(approximately 1.4 CY) from the surrounding area. The next 2 feet of the shaft will then be filled with concrete to <br />form a top plug for the shaft. Fill material will be placed in the remaining 3 feet of the shaft (approximately 1.4 <br />CY), and then the site will be topsoiled and revegetated. The redistributed topsoil will be seeded with the <br />pastureland seed mixture. <br />EMD Ventilation Site <br />When the facilities are no longer required, they will be dismantled and removed from the site. The fans, silencer, <br />supports, and associated buildings will be removed and hauled from the site. The concrete pads, footers, and piers <br />will be broken -up and placed into the cased hole. Cement plugs will be poured in the bottom 15 feet of each hole, and <br />in the intervals corresponding to the Twentymile Sandstone and 20 feet above and below it. The remainder of the <br />hole will be filled with inert material. A cement plug will be poured from 10 feet to 3 feet below ground surface, and <br />the top 3 feet will be filled with soil. After the shaft has been plugged and the building materials removed, the site <br />will be regraded to blend with the surrounding terrain. The topsoil will then be reapplied to the site and seeded with a <br />pastureland seed mixture. <br />Dewatering Borehole and Mine Water Recycle System <br />Upon completion of mining, and when the system is no longer required, the facilities will be removed and the site <br />reclaimed. Removal of the surface facilities will involve removal of the modular electro- coagulation units (2); <br />dismantling of surface structures, which includes the powerlme, transformer and pad, any remaining chemical and <br />pump control equipment, buildings and pads; and reclamation of the ponds and road. After the facilities are removed, <br />the site will be regraded to blend with the existing terrain and the stockpiled topsoil redistributed over the area. The <br />topsoil redistributed over the dewatering site and reclaimed road segments will be seeded with the pastureland seed <br />mixture. <br />TR07 -59 <br />2.05 -105 03/26/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.