Laserfiche WebLink
NOTIFICATION OF INTENT TO SEEK PARTIAL LIABILITY RELEASE <br />PROPOSED PUBLIC NOTICE <br />Twentymile Coal, LLC (TC) has filed an application with the Colorado Division of Reclamation, Mining, and Safety <br />( CDRMS) for partial release (Phase 1 Bond Release) of reclamation liability for several areas of the Foidel Creek Mine <br />(Mine). These facilities and areas, which include the CYCC Office Building, Eastern Mining District (EMD) /9 -Right <br />Ventilation Shaft Installation, 18 -Right Intake Shaft Installation, and Fish Creek Tipple Facilities and an associated soil <br />material stockpile located near the Middle Creek (Pit 3) Shop, are no longer needed to support ongoing or future operations, <br />and have therefore been reclaimed. TC is the current owner, operator, and permittee under Permit No. C -82 -056 for the <br />Mine and related support facilities. The Mine is located approximately twenty miles southwest of Steamboat Springs, <br />Colorado near the intersection of Routt County Roads 27 and 33. TC's business address is: <br />Twentymile Coal, LLC <br />29515 RCR27 <br />Oak Creek, Colorado 80467 <br />(970) 879 -3800 <br />The partial liability release request covers areas within the Mine Permit Boundary that encompass the following specific <br />areas; Township 5N, Range 87W, 6 Principal Meridian — Portions of Sections 2, 10, 11, 13, 14, and 29. These areas are <br />shown on the Rattlesnake Butte and Milner 7.5 minute USGS Quadrangle Maps. <br />The CYCC Office was constructed in 1967, and demolished in 2006. The EMD /9 -Right Ventilation Shaft Installation was <br />permitted (TR95 -24) and constructed in 1996 to provide adequate mine ventilation airflow for ongoing operations m the <br />Eastern and Northern Mining Districts. With completion of active mining in these areas, the associated facilities and area <br />were reclaimed in 2009 -2010. The 18 -Right Intake Shaft Installation was permitted (TR04 -44) and constructed to provide <br />adequate mine ventilation airflow for ongoing operations in the Northern Mining District. Subsequent additions included <br />installation of an escape hoist in 2005 (MR05 -200), shaft heaters in 2007 (MR07 -225), and Mine Atmosphere Control <br />Borehole in 2008 (MR08 -229). With completion of active mining in this area, the associated facilities and area were <br />reclaimed in 2009 -2010. <br />The Fish Creek Tipple Facihties were constructed in 1974 to receive, handle, and load coal to rail from the Energy Fuels <br />No. 3 Mine and other Energy Fuels surface mining operations which were active at the time. The facility remained in use <br />through about 1980. As applicable regulations were promulgated, this facility was re- permitted by Cyprus Yampa Valley <br />Coal Company in 1984, in anticipation of possible use in conjunction with a nearby underground test mine. The Facility <br />has remained idle since about 1980, and was reclaimed during the period 2011 -2012. <br />The requested partial liability release addresses release of TC from any further liability for the facilities demolition and <br />removal, shaft sealing, backfilling, grading, and drainage control activities that have been completed for the subject <br />reclaimed areas. TC will retain liability for effective drainage control and revegetation of the subject areas, until such time <br />as applicable revegetation success standards are achieved. Approval of the requested Phase 1 partial liability release will <br />not affect the remaining reclamation bond, which will remain in -place to address any potential current and future remaining <br />liabilities associated with all other active mine disturbance areas. Based on the DRMS's most recent bonding calculations, <br />the bond surety that will remain in -place following approval of the partial liability release will be more than adequate to <br />address the remaining liabilities. <br />The following individuals or entities hold surface or mineral rights and interests within the portions of the Mine Permit <br />Boundary subject to the requested partial bond release: <br />State of Colorado — Board of Land Commissioners <br />Camilletti & Sons <br />Twentymile Coal, LLC <br />Written comments, objections, and requests for public hearing or informal conference may be submitted to the CDRMS at <br />the following address: <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street — Room 215 <br />Denver, Colorado 80203 <br />Phone — (303) 866 -3567 <br />Any comments, objections, or requests must be submitted within 30 days of the last date of publication of this notice, or 30 <br />days following the bond release inspection, whichever is later. <br />