Laserfiche WebLink
maintained onsite support that these dust mitigations measures have been consistently utilized. In <br />light of the consistent utilization of the mitigation required by the permits, the operator believes <br />during Phase I Work activities, including the day of the inspection, it has operated in compliance <br />with the permits' fugitive dust emission mitigation requirements. <br />Please let me know if you have any questions. <br />Sin rely, <br />Douglas C. White, P.E. <br />Director of Technical Services <br />Cc: Ms. Sandra L. Brown, DRMS <br />Lance Wade, NHM, via email <br />Ross Gubka, NHM via email <br />