My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-13_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2012-11-13_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:31 PM
Creation date
11/13/2012 1:39:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
11/13/2012
Doc Name
Adequacy Review Comments
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Also included with this response package are the appropriate SEDCAD materials <br />indicating the results presented above for each channel. Colowyo will be <br />submitting a technical revision in the near term which will address these as -built <br />conditions. If you should have any additional questions or concerns please feel <br />free to contact me at your convenience at (970) 824 -1532. <br />Sincerely, <br />draining more than 1 square mile. With that being said, the results are as <br />follows for a 10 year, 24 hour event: <br />SEDCAD is unable to model a channel with multiple inputs, i.e. rock lined <br />and vegetation lined. Without ability to input both parameters into <br />SEDCAD, and with the SEDCAD outputs presented above, Colowyo <br />believes the Taylor Tributary Ditch is stable and erosion free in its current <br />state. Colowyo also believes that this ditch with both a riprap and <br />vegetation lining is more than adequately to safety pass a 100 year, 24 <br />hour event. <br />Additionally, during the Division's site inspection on October 10, 2012, <br />Mr. Rob Zuber stated that the Division is capable of utilizing professional <br />judgment to determine stability and as -built conditions to determine <br />whether the ditch meets requirements of the PAP and the Act. Colowyo <br />believes this is an area where the Division should exercise that <br />Professional Judgment, and approve the as -built design of the Taylor <br />Tributary Ditch. <br />Tony Tennyson <br />Environmental Engineer <br />Encl. <br />Cc: file SL -06 Binder <br />COAL <br />COMPANY <br />+'+s.raouacel °� <br />Vegetated Lined Channel (Smooth Brome) = 6.6 fps <br />Riprap Lined Channel (Manning N of 0.035) = 7.2 fps <br />A Western Freels - Colorado, LLC mining property <br />
The URL can be used to link to this page
Your browser does not support the video tag.