Laserfiche WebLink
jtoner r ngineering & ,5urveying <br />Engineering, Testing & Surveying <br />Material from the Coal Waste Pile was being removed from the west side of the site and <br />trucked and spread to the top of the refuse pile located along the east side of the site per the <br />determination made by the Division of Mining, Reclamation & Safety (see Pic. 4 & 5). <br />With the exception of the items noted above, the remaining features appeared to be in a state <br />of good repair and functional. Repairs to the pipes and completion of the finish grading of both <br />storage ponds will be reviewed during the next quarterly investigation. <br />Please let me know if you have any additional questions or concerns in regards to the issues <br />that are discussed above or if the actual conditions differ from what I have stated above. <br />Sincerely, <br />�•_ ry,a,pt•O 1.. <br />�7 <br />•i <br />V <br />�r 4'1�'�Y•. <br />Ryan M. Griglak, P.E. <br />o *-.s ( ohs Im <br />Project Manager <br />)., •"iJ•,i <br />�.1` s °���ooauaaa <br />°�., <br />P.O. Box 1163 28 South Washington Street <br />970.565.7483 stoneren ineerL trontier.net <br />Cortez, Colorado 81321 <br />970.565.7704 <br />