My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981022 (23)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
_INSPECTION - C1981022 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 4:52:32 PM
Creation date
11/9/2012 1:56:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Jim Kiger
Inspection Date
11/5/2012
Email Name
SLB
SB1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 5,2012 C-1981-022/Elk Creek Mine SLB <br /> from north to south. The operator must reduce the footprint of the pile so that water will flow directly to Pond B, <br /> as approved in the permit application,or propose a revision to the approved drainage plan in the permit application <br /> package to address this area. <br /> OTHER(SPECIFY): <br /> The annual Applicant Violator System site inspection(required under the Division's memorandum of <br /> understanding with the Office of Surface Mining)was conducted in conjunction with this complete inspection. <br /> Documentation of that inquiry is attached. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> Mine identification signs,disturbance boundary markers, and topsoil markers were observed to be in good <br /> condition and in the appropriate locations throughout the site. <br /> TOPSOIL—Rule 4.06❑ Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br /> Redistribution 4.06.4: <br /> Topsoil stockpiles observed at the three previously mentioned gob vent borehole sites and on the upper <br /> bench were stable and properly identified. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,NOV C-2012-008 remains <br /> outstanding. <br /> Infraction Number: CV2012008 <br /> Inspection Date: October 19,2012 <br /> Date Issued: <br /> Primary Topic: Support Facilities On-site <br /> Secondary Topic: Administrative <br /> Tertiary Topic: <br /> Description: Failure to obtain approval of a revision to the surface coal mining and reclamation <br /> operations prior to implementation. <br /> Abatement#: 1 <br /> Abatement Due Date: 11/9/2012 <br /> Abatement Description: Submit a revision and a reclamation cost estimate to permit C-1981-022 <br /> to incorporate the electric substation. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.