Laserfiche WebLink
13. Robinson Tailing Pond <br /> a) Rock cap -- $ 2 ,973 <br /> b) Flood control -- 660 <br /> c) Highway crossing -- 2 ,000 <br /> d ) Soil (110 ,000 yd3) -- 154 <br /> e) Revegetation 677 1,523 <br /> Total 677 T7 ,3T6 <br /> 14. No. 1 Dam <br /> a) Rock cap -- $ 576 <br /> b) Revegetation 144 324 <br /> Total 144 $ 900 <br /> 15 . No. 2 Dam <br /> a) Rock cap -- $ 125 <br /> b) Revegetation 44 99 <br /> Total 44 $ 224 <br /> 16. Robinson Service Corridor <br /> a) Dismantle , break even -- -- <br /> b) Permanent use <br /> (13 rds . + 17 res . ) 30 -- <br /> c) Grading & site prep. -- $ 20 <br /> d) Robinson Lake (rock cap) -- 465 <br /> e) Reveg. (92 lake + <br /> 70 other) 162 365 <br /> f) Maint . fert . 20 1 <br /> g) Buffer 159 -- <br /> Total 371 85 <br /> 17. Lower Eagle Service Corridor <br /> a) Permanent use (road) 4 -- <br /> b) Grading & site prep. -- $ 2 <br /> c) Revegetation 120 270 <br /> d) Buffer 98 -- <br /> Total 222 $ 272 <br /> 18 . oxide Tailing Pond <br /> a) Rock cap -- $ 359 <br /> b) Revegetation 64 144 <br /> Total 64 $ 503 <br /> 19. No. 4 Dam <br /> a) Grading (covered in Area 18 ) <br /> b) Revegetation 17 $ 38 <br /> Total 17 $ 38 <br /> -5- <br />