Laserfiche WebLink
TABLE 1: Rock Haul Calculations <br /> Acres Tons Loading/ Loading & Average Hauling/ Hauling/Road <br /> (projected) @ 3' deep Spreading Spreading Haul Road Maint. Construction <br /> Area to 1986) 1.5 T/yd3 Cost/'Ibn Subtotal Miles Ton Miles Cost/Ton & Maintenance Total <br /> i <br /> Robinson Pond 677 4,915,000 $ 0.16 $ 786,400 2.78 13,663,700 $ 0.16 $2,186,192 $ 2,972,592 <br /> No. 1 Lam 144 1,045,440 0.16 167,270 2.44 2,550,873 0.16 408,340 575,610 <br /> Oxide Pond 64 465,000 0.16 74,400 3.83 1,780,950 0.16 284,952 359,352 <br /> No. 2 Dam 44 319,440 0.16 51,110 1.45 463,188 0.16 74,110 125,220 <br /> Tenmile Pond 524 3,805,000 0.16 608,800 2.01 7,648,050 0.16 1,223,688 1,832,488 <br /> No. 3 Lam 109 719,340 0.16 115,094 2.48 1,783,963 0.16 285,434 400,528 <br /> Mayflower Pond 375 2,722,500 0.16 435,600 3.98 10,835,550 0.16 1,733,688 2,169,288 <br /> No. 5 Dam 30 217,800 0.16 34,848 4.49 977,922 0.16 156,467 1Y�191,315 <br /> Robinson Lake 100 726,000 0.16 116,160 3.00 2,178,000 0.16 348,480 464,640 <br /> 2,067 14,935,520 $2,389,682 41,882,196 $6,701,351 $9,091,033 <br />