My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-03-05_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1985-03-05_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:14:35 PM
Creation date
11/7/2012 6:51:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/5/1985
Doc Name
Board Meeting, Reclamation Costs, and Annual Report
From
MLRD
To
Climax
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�w°� c°`°�90 IIIIIII <br /> N o DEPARTMENT OF NATI IIIIIIIIIIII <br /> 999 <br /> David H.Getches,Executive Dir <br /> h( � <br /> MINED LAND r.,aCLAMATION DIVISION <br /> 1876 DAVID C.SHELTON, Director <br /> Richard D.Lamm <br /> Governor <br /> r <br /> 'March 5, 1985 <br /> Mr. Larry Brown <br /> Deputy Director, Environmental Control <br /> Climax Molybdenum Company <br /> 1727 Cole Boulevard <br /> Golden, Colorado 80401 <br /> Re: Climax Mine, Permit No. 77-493 <br /> Dear Mr. Brown: <br /> This letter is in response to your recently submitted annual report and <br /> attached 1985-86 reclamation cost summary. We have broken our comments into <br /> three areas: Board meeting, reclamation costs, and annual report. <br /> Board Meeting <br /> As you know, the reclamation costs you have submitted need to be approved by <br /> the Board. As such, we have scheduled the matter of "Financial Warranty <br /> Reconsideration" for the March 27-28, 1985 meeting. <br /> Along with reconsideration of the financial warranty, ,we believe the Board <br /> would like to hear an update of not only the Climax site but also the <br /> Henderson Mine site. As such, project updates for both the Climax and <br /> Henderson sites have been scheduled. Please let us know how much time you <br /> would like set aside for these project updates. We feel that it would be <br /> appropriate for either you or someone else in your Company to present the <br /> updates. <br /> Reclamation Costs <br /> After reviewing your reclamation cost submittal , we had a number of concerns. <br /> These concerns have been broken into two sub-headings: "general comments" and <br /> "specific comments" . The "general comments" are those items (eg. Grading and <br /> site preperation) that occur in a number of areas; whereas the "specific <br /> comments" are for items that are exclusive to one area. For the "specific <br /> comments", we have utilized your numbering sequence for ease of reference. <br /> General <br /> 1 . Please provide documentation as to how the costs were derived for "Grading <br /> and site preperation" for each site requiring such activity. <br /> 423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.