Laserfiche WebLink
9` 4 <br />J <br />of <br />West Elk Mine's 24 October 2012 Inspection Report <br />Stark, Jim <jim.stark @state.co.us> Wed, Oct 31, 2012 at 3:03 PM <br />To: "Welt, Kathy" <KWelt @archcoal.com> <br />Cc: Alysha Hernandez <alysha.hernandez @ state.co.us> <br />Kathy, <br />Attached is the 24 October 2012 complete inspection report for the West Elk Mine. As I discussed with Jessica <br />before I left, everything looked good on the site. I was very impressed with the reclamation work on the E1 and <br />Box Canyon MDWs and with the new E4 MDW pads. Please let me know if you have any questions or <br />comments regarding this report. Thanks. <br />West Elk Inspection Report - 24 October 2012 - Complete -pdf <br />5281 K <br />