Laserfiche WebLink
October 17,2012 C-1981-025/North Thompson Creek Mine BFB <br /> The ditch between pond T2 and the outfall was dry. No water was flowing through the outfall. <br /> ROADS—Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br /> Maintenance4.03.1(5)and(6)/4.03.2(5) and(6) Reclamation 4.03.1(7)/4.03.2(7): <br /> The main gate was closed but not locked or tied shut. The access road was in good condition and <br /> passable. <br /> DOCUMENTS RECEIVED: None <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were taken as a result of this inspection and none are pending. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 5 <br />